Singapore Building Submission Glossary: ST BP ERSS FSC WD TOP CSC and Other Terms Explained

7 days ago
8 min read

Singapore authority submissions run on abbreviations. BP is the building plan and ST the structural plan submitted to the Building and Construction Authority (BCA), ERSS is an earth retaining or stabilising structure, FSC is the Fire Safety Certificate from the Singapore Civil Defence Force (SCDF), WD is a Written Direction, and TOP and CSC are the two BCA completion documents. This glossary defines more than 60 terms, each checked against the agency page that uses it, with the governing agency named.

People and roles

These are the people who sign, check, supervise or inspect. Most are defined in the Building Control Act, the Fire Safety Act or the Professional Engineers Act.

  • QP (Qualified Person): a registered architect or a professional engineer holding a valid practising certificate, appointed to prepare and submit plans to BCA and other agencies. See QP submission step by step.

  • PE (Professional Engineer): an engineer registered with the Professional Engineers Board in the civil, electrical, mechanical or chemical branch. See how to check a PE.

  • PE(Geo): a specialist professional engineer registered under the Professional Engineers Act in geotechnical engineering. See what a PE(Geo) does.

  • QP(ST) and QP(Geo): BCA shorthand for the QP for structural works and the geotechnical QP appointed alongside for geotechnical building works.

  • AC (Accredited Checker): an independent engineer who checks the structural design and certifies it to BCA. An individual AC is limited to projects not exceeding $15 million in value. See when a project needs an AC.

  • ACO (Accredited Checking Organisation): a checking firm whose ACs may take on projects of any value.

  • AC(Geo): a specialist accredited checker for the geotechnical aspects of geotechnical building works.

  • RE and RTO (Resident Engineer and Resident Technical Officer): site supervisors appointed by the QP to supervise structural works, accredited by the Joint Accreditation Committee of IES and ACES. See site supervision roles.

  • RI (Registered Inspector): a person registered under the Fire Safety Act to inspect completed fire safety works, either RI (Architectural) or RI (M&E).

  • FSE (Fire Safety Engineer): an engineer registered with SCDF who prepares performance-based fire safety designs, also called alternative solutions.

  • FSM (Fire Safety Manager): a certified person whom owners of larger public and industrial buildings must appoint under SCDF rules.

  • CP (Competent Person): in facade inspection, the professional the owner appoints to carry out a Periodic Facade Inspection.

  • QECP (Qualified Erosion Control Professional): the professional who designs and endorses the Earth Control Measures plan submitted to PUB.

  • PEB (Professional Engineers Board): the statutory board that registers professional engineers and licenses engineering firms.

  • BOA (Board of Architects): the board that registers architects and issues their practising certificates.

  • MCST (Management Corporation): the body of all unit owners in a strata development. It takes the owner's role for inspections and gives consent for works.

BCA submissions

BCA administers the Building Control Act, which requires plan approval and a permit before building works start, unless the works are exempt.

  • BCA (Building and Construction Authority): the building control regulator.

  • BP (Building Plan): the architectural plan submission to BCA, showing compliance with the building regulations. See BP and ST compared.

  • ST (Structural plan): the structural plans and calculations submitted to BCA. Only a QP who is a PE in the civil or structural discipline can apply.

  • Permit to carry out structural works: the BCA permit needed after ST approval and before structural works start, applied for jointly by developer, QP and builder.

  • WD (Written Direction): an agency's written reply to a submission that is not yet approvable, listing what must be corrected or clarified before resubmission. See what a WD means.

  • A&A (Additions and Alterations): works to an existing building. See the A&A guide.

  • Insignificant building works: minor works listed in the First Schedule of the Building Control Regulations that need no BCA plan approval or permit. See the list.

  • Lodgment Scheme: a BCA scheme introduced in December 2023 under which a QP lodges plans for less complex, lower-risk works and they are deemed approved.

  • SGFA (Statistical Gross Floor Area): the total plan-view area of all covered spaces, used to compute BCA plan fees.

  • PSI (Periodic Structural Inspection): inspection of an existing building by a structural engineer, every 5 years for non-residential and every 10 years for residential buildings. See the PSI guide.

  • PFI (Periodic Facade Inspection): facade inspection every 7 years for buildings more than 20 years old, in force since January 2022. See the PFI guide.

Planning (URA)

The Urban Redevelopment Authority (URA) grants planning permission, which BCA requires before it will approve building plans.

  • URA (Urban Redevelopment Authority): the planning authority.

  • PP (Provisional Permission): URA's in-principle planning approval, which lapses after 6 months.

  • WP (Written Permission): URA's final planning approval, which lapses after 2 years. See WP and PP timelines.

  • GFA (Gross Floor Area): the total area of covered floor space, used by URA to control the bulk and intensity of a development.

  • Plan Lodgment Scheme: a URA scheme under which qualifying works are lodged with a QP's declaration and treated as authorised without a planning application.

  • LBC (Land Betterment Charge): a tax on the increase in land value from a planning permission, administered by the Singapore Land Authority (SLA) since 1 August 2022.

Fire safety (SCDF)

SCDF administers the Fire Safety Act 1993. See the full fire safety jargon guide.

  • SCDF (Singapore Civil Defence Force): the fire safety regulator.

  • FSSD (Fire Safety and Shelter Department): the SCDF department name on older circulars and forms. Recent circulars are signed by the Fire Safety Department.

  • Fire Code: the Code of Practice for Fire Precautions in Buildings. The 2023 edition took effect on 1 March 2024.

  • FSC (Fire Safety Certificate): issued by SCDF after all fire safety works are complete. It must be obtained before the premises are used or occupied.

  • TFP (Temporary Fire Permit): allows occupation for a limited period when only very minor fire safety items remain outstanding.

  • MAA (Minor Addition and Alteration): a lodgement route for minor works listed in the fire safety regulations, lodged by a QP before works start, at $90 per submission.

  • FC (Fire Certificate): a recurring certificate for designated buildings confirming that fire safety systems are maintained. It is a different document from the FSC.

  • Waiver: an application to SCDF to depart from a Fire Code requirement, at $160 per item, made before the formal plan submission.

Geotechnical

Geotechnical terms come from the Building Control Act and BCA's guidance on geotechnical building works.

  • GBW (Geotechnical Building Works): works such as tunnels more than 2 m in diameter, width or height, excavations and earth retaining structures more than 6 m deep, slopes more than 6 m high, and foundations for buildings of 30 or more storeys. See deep excavation and AC(Geo).

  • ERSS (Earth Retaining or Stabilising Structures): structures that hold back soil during or after excavation. See ERSS thresholds.

  • Site investigation: boreholes and soil testing, which must be done by a firm accredited by the Singapore Accreditation Council. See soil investigation.

  • RPZ (Railway Protection Zone): land within 40 m of the outermost edge of a railway, where restricted activities need the Land Transport Authority's prior written permission. See building near MRT lines.

  • Railway safety zone and 1st reserve: land within 60 m and within 6 m of the railway respectively.

Other agencies

Each technical agency clears its own part of a submission. See technical agency clearances.

  • LTA (Land Transport Authority): roads, parking and railway protection.

  • PUB: Singapore's national water agency, covering drainage, sewerage and sanitary works.

  • NEA (National Environment Agency): pollution control and environmental health.

  • NParks (National Parks Board): trees, greenery and planting.

  • DC (Development Control) clearance and DP (Detailed Plan) clearance: the two PUB clearances a QP obtains before sewerage, sanitary and drainage works proceed.

  • ECM (Earth Control Measures): measures that stop silt from a construction site entering drains. The ECM plan is endorsed by a QECP and submitted to PUB.

  • JTC plan consent: JTC's consent as landowner to works on its industrial land, applied for through CORENET.

  • HDB (Housing and Development Board): the public housing authority, which sets renovation rules for flats.

  • MOM (Ministry of Manpower): administers the WSH Act and dormitory licensing.

  • WSH (Workplace Safety and Health): the Act covering the safety, health and welfare of people at work.

  • FEDA (Foreign Employee Dormitories Act): the MOM licensing law that has covered dormitories with 7 or more beds since 1 April 2023.

  • DTS (Dormitory Transition Scheme): MOM's scheme requiring existing dormitories to meet interim standards by 2030 and the New Dormitory Standards by 2040.

Completion

A building may be occupied only after BCA issues a TOP or CSC, applied for by the project QP. See TOP and CSC.

  • TOP (Temporary Occupation Permit): issued when a building is suitable for occupation but some requirements remain outstanding.

  • CSC (Certificate of Statutory Completion): issued when all statutory requirements and agency clearances are met.

  • Certificate of Supervision: the QP's certificate that building or structural works were supervised, submitted with the TOP or CSC application.

  • As-built plans and record plans: plans showing what was actually built, including the record structural plans and calculations.

Digital submission

CORENET is the government's electronic submission system for building plans, and CORENET X is its replacement. See the CORENET X guide.

  • CORENET (Construction & Real Estate Network): the e-submission system. The current version is CORENET 2.0.

  • CORENET X: the new platform led by BCA and URA, in which seven agencies review one coordinated submission. It has been mandatory for new projects of 30,000 sqm GFA or more since 1 October 2025 and for 5,000 sqm or more from 1 October 2026. Smaller projects can stay on CORENET 2.0 for now.

  • RABW (Regulatory Approval Process for Building Works): the CORENET X process built around three sequential gateways.

  • DG (Design Gateway): the first gateway, which settles planning parameters, including URA PP and the DC clearances.

  • PG (Piling Gateway): an optional gateway for piling and foundation works.

  • CG (Construction Gateway): the gateway giving URA WP, BCA BP and ST approvals and SCDF BP approval.

  • Completion Gateway: the TOP and CSC application.

  • DSP (Direct Submission Process): a single-stage route for simpler projects such as a single landed house.

  • BIM (Building Information Model): the coordinated 3D model that project teams submit under CORENET X, supported by 2D drawings and reports where needed.

  • IFC-SG: Singapore's representation of local regulatory requirements in the Industry Foundation Classes (IFC) openBIM standard.

Which terms are most often confused?

The pairs below cause most of the mix-ups. In each pair the two terms come from different agencies or different stages.

  • FSC and FC: the FSC is a one-time SCDF certificate at completion. The FC is renewed periodically for designated buildings.

  • WD and WP: a WD asks for corrections. A WP is URA's planning approval.

  • TOP and TFP: a TOP comes from BCA and a TFP from SCDF. A project may need both.

  • DC: in PUB usage it means Development Control clearance. Development Charge was the older name of a charge now replaced by the LBC.

  • BP: BCA, SCDF, LTA, NEA and PUB each give their own BP approval or clearance.

FAQ

What does ST stand for in a BCA submission?

ST means the structural plan submission. Only a QP who is a professional engineer in the civil or structural discipline can apply for it.

Is a PE the same as a QP?

No. A PE is a registered engineer. A QP is a registered architect or PE with a valid practising certificate who has been appointed for a submission. See PE endorsement and QP submission compared.

What is the difference between TOP and CSC?

A TOP lets a building be occupied while some requirements remain outstanding. A CSC is issued when every requirement and clearance is met.

Does every project need an AC?

No. Minor building works listed in the Fourth Schedule of the Building Control Regulations, such as houses not exceeding 3 storeys, do not need an AC certificate.

Sources

CVC Engineers advocates education and public awareness, and has a dedicated team to help resolve this properly, including BCA submissions and PE endorsement. WhatsApp or call +65 9342 7551. Last reviewed: November 2026.

Recent Posts

See All
Singapore Building Compliance Handbook 2027

A map of Singapore building compliance rules for 2027: PE endorsement, QP submissions, geotechnical, demolition, inspection, factories, landed houses, procurement and a dated 2027 at-a-glance list, wi

 
 
 

Comments


© 2024 CVC Engineers. All rights reserved.

bottom of page