Soil Investigation in Singapore: Boreholes SPT and What BCA Requires

Nov 11
6 min read

Soil investigation in Singapore is the design qualified person's responsibility, not the drilling contractor's. BCA requires the design QP to plan the investigation in accordance with Eurocode 7 and the Geotechnical Society of Singapore (GeoSS) guide, to have the fieldwork carried out by an inspection body accredited by the Singapore Accreditation Council (SAC), and to submit a site investigation (SI) report certified by a professional engineer with the structural plans. From 1 March 2026, BCA's guideline on SI reports also sets mandatory minimum contents for that report.

What does BCA require for soil investigation?

BCA requires a proper and adequate site investigation before foundations, tunnels, site formation, excavations or earthworks are designed. A BCA circular dated 20 September 2023 reminds design QPs that, under Regulation 31 of the Building Control Regulations, the design QP shall investigate the site to establish the type and character of the ground and groundwater conditions, shall do so in accordance with relevant standards and codes of practice, and shall ensure that all site investigation works are carried out by an accredited inspection body for site investigation approved by SAC.

The circular names the relevant standards as Eurocode 7 and the GeoSS "Guide on Ground Investigation and Geotechnical Characteristic Values to EC7". On the adequacy of boreholes, in-situ field tests and laboratory tests, the design QP shall comply with the GeoSS guide, and may investigate more extensively for complex or uncertain sites.

Who can carry out soil investigation in Singapore?

Only an inspection body accredited by SAC under its scheme for Inspection Bodies for Site Investigation can carry out site investigation works for a BCA submission. BCA's June 2026 ERSS submission requirements place the duty on the design QP to ensure this.

Laboratory testing is controlled in the same way. BCA's Guideline on Requirements for Site Investigation Reports (circular APPBCA-2025-16, 1 September 2025) states that all laboratory test reports shall be prepared by laboratories accredited by SAC. For specialised tests outside SAC's schedule of soil and rock testing, other laboratories with recognised accreditation or in-house capability may be engaged, subject to the QP's acceptance.

The accredited firm drills, samples, tests and reports. Planning the investigation and interpreting the results remain with the engineer. See what a PE(Geo) does.

How many boreholes are needed and how deep?

BCA does not fix one number for all projects. It points to Clause 2.4.1.3 of Eurocode 7 and the GeoSS guide for the minimum number of boreholes and their depth, and expects additional boreholes and tests where necessary. One figure BCA has restated is in its 1 December 2025 circular on sheet pile walls: the GeoSS 2015 guidelines recommend one borehole every 10 to 30 m along the alignment for an earth retaining or stabilising structure (ERSS) deeper than 6 m.

BCA's 2023 circular adds requirements on the extent of the investigation:

  • For structures on or near slopes and steps in the terrain, including excavations, boreholes shall be carried out, including outside the project area, so that both local and overall stability can be assessed.

  • Investigation points should be placed to verify changes in ground stratification, for example near watercourses where alluvial deposits may be found, or near the interface of two geological formations.

Borehole depth depends on the foundation type and loads, so it is set by the design QP for each project. See foundation design in Singapore.

What is a desk study and why does BCA expect one?

A desk study is the review of existing information before any drilling, and BCA expects it as the first step. The SI report guideline cites SS EN 1997-2:2007 clause 2.2 and names two key resources: the Singapore Geological Map and Memoir (BCA, 2021), and existing borehole data available to the public through the Singapore Land Authority's INLIS portal. The 2023 circular lists walkover surveys, site visits, topographical surveys and historical land use as further inputs. The purpose is to decide the investigation methods and borehole positions so that the ground stratification and groundwater level are captured.

What is the SPT and how is it reported?

The standard penetration test (SPT) is an in-situ test carried out in the borehole, and its result, the N-value, is used to describe the density of coarse soils and the consistency of fine soils in the borehole log. BCA uses SPT N-values as benchmarks in its own guidance, for example hard soil as SPT N above 30 in its geotechnical building works guidance.

Because the result depends on the equipment, BCA's guideline makes two items mandatory:

  • The calibration certificate for each SPT hammer used must be submitted.

  • The SPT energy ratio (Er) must be reported in the borehole log.

What must an SI report contain for a BCA submission?

An SI report must meet the minimum requirements in Table A of BCA's guideline, which are mandatory for building works submissions. They apply to new projects submitted to URA for planning permission on or after 1 March 2026 and to SI reports dated on or after 1 March 2026. The requirements are:

  1. Format: a standalone PDF report and the data in AGS(SG) electronic format, using BCA's file naming convention. The SI report is not to be renamed or combined into the QP's design report.

  2. Certification by an appropriate professional engineer, verifying the accuracy of the information in the report.

  3. Stratum descriptions using the geological codes of Singapore's new stratigraphic framework and Eurocode 7 compliant material codes.

  4. An as-built borehole location plan, the boreholes marked on the Singapore Geological Map (BCA, 2021), and a table of borehole coordinates in SVY21, ground levels in Singapore Height Datum and termination depths.

  5. Field and laboratory test results reported to the applicable EN or BS standards, with equipment calibration documents, quantities of work done, and the names and signatures of responsible personnel.

  6. SPT hammer calibration certificates.

How is the SI report used in design?

The SI report is the evidence for the ground model and design parameters in the foundation, ERSS and slope design. BCA's guideline describes the test results as substantiation for the parameters proposed for adoption, and its submission requirements for ERSS and geotechnical building works both call for the site investigation report with PE certification to be included in the plan submission.

The same data feeds the wall design for a deep excavation, the impact assessment for neighbouring structures and the instrumentation and monitoring plan.

Which authority and standard governs what?

  • BCA: the Building Control Act 1989 and Building Control Regulations 2003, including the duty to investigate the site, and the SI report guideline.

  • SAC: accreditation of inspection bodies for site investigation and of soil and rock testing laboratories.

  • Standards: Eurocode 7 (SS EN 1997-1 for design with its Singapore National Annex, and SS EN 1997-2 for ground investigation and testing), supported by the GeoSS guide and BS 5930.

  • URA: the planning permission application date determines whether the March 2026 guideline applies.

Common mistakes in soil investigation

The common mistakes are the ones BCA's circulars were written to correct:

  • Leaving the scope to the SI contractor's standard quotation. BCA advises developers to engage their QPs early so that methods and tests are decided jointly within the SI contract.

  • Skipping the desk study and missing a geological boundary.

  • Drilling only inside the boundary on a sloping site, so overall slope stability cannot be checked.

  • Merging the SI report into the design report, or submitting it without PE certification.

FAQ

Is soil investigation mandatory in Singapore?

For regulated building works, yes. BCA states that the design QP shall undertake an investigation of the site where foundations, tunnels, site formation, excavations or earthworks are to be constructed.

Who signs the soil investigation report?

An appropriate professional engineer certifies the accuracy of the information in the SI report.

Can I reuse an old soil report or a neighbour's boreholes?

Existing borehole data is a recognised desk study resource, but the design QP decides whether it is adequate for the new design.

How many boreholes does a house need?

BCA sets no single number. The design QP follows Eurocode 7 and the GeoSS guide and adds boreholes where the ground is variable.

Sources