Periodic Facade Inspection in Singapore: Which Buildings and What Is Checked
Updated: 7 days ago
Periodic Facade Inspection (PFI) applies to buildings in Singapore that are more than 20 years old and more than 13 metres tall, and it must be carried out every seven years. The owner appoints a Competent Person, who visually inspects the entire facade, carries out a close-range inspection of 10% of each elevation, and reports to the Building and Construction Authority (BCA) with any repairs needed. Landed houses used for residence and temporary buildings are excluded.
Which buildings need a Periodic Facade Inspection?
According to BCA, the regime, which started on 1 January 2022, applies to buildings that are:
aged 20 years and older, and
over 13 metres in height.
Excluded are detached, semi-detached, terraced or linked houses used for residential purposes, and temporary buildings. BCA's FAQ explains that the regime does not apply to a building whose highest point is 13 metres or lower when measured from the ground. Where one address has a mix of taller and lower buildings, only those above the threshold must be inspected.
How often, and how does the process start?
Inspection is required every seven years. The process begins when BCA serves a PFI notice on the owner. BCA has said it issues advisories about a year before a building is due, so that owners can budget for it.
Once the notice arrives, the owner must appoint a Competent Person within 2 months of the date of the notice. For strata developments this falls to the management corporation. Owners of a building that is not strata-subdivided must jointly appoint one Competent Person.
Who can carry out the inspection?
Competent Person (CP): a Professional Engineer or Registered Architect who has completed the Certificate in Facade Inspection course run by the BCA Academy and the IES Academy. The CP must have no professional or financial interest in the building. Someone who was responsible for its design or construction would not qualify.
Facade Inspector (FI): assists the CP with visual and close-range inspection, under the CP's direct supervision and control. BCA says an FI can be a Resident Engineer, Resident Technical Officer or another person with the qualification BCA specifies.
The CP remains responsible for the inspection and its findings. BCA publishes a list of Competent Persons. To confirm that an engineer holds a current practising certificate, see how to check a Professional Engineer.
What is checked, and in what stages?
Full visual inspection. The condition of 100% of the facade is inspected from the ground or other vantage points, often with photographs. Drones may be used to assist.
Close-range inspection. The CP inspects 10% of each building face at close range, using tools such as tapping rods and scanning devices.
Report and recommendations. The CP recommends remedial measures and submits the report to BCA through CORENET. BCA reviews it and may ask for clarification or a joint site inspection.
Full facade investigation, if needed. Where widespread or potentially systemic defects are seen, the CP can propose a fuller investigation, which needs the Commissioner of Building Control's prior approval. It can include design checks, tests, and exposing concealed elements such as curtain wall brackets.
Remedial works. After BCA accepts the report, the owner must complete the recommended works within the period BCA specifies and submit the CP's certification of completion.
If the CP finds an unsafe defect, the CP must notify the Commissioner immediately and work with the owner on measures to protect the public. Where repairs involve structural elements or building works, plan approval and a permit must be obtained first, and a Professional Engineer must be engaged if the CP is not one.
What does the owner need to provide?
BCA's guidance asks owners to:
give the CP access to the building perimeter;
provide an access system for the close-range inspection, such as a gondola, mobile elevating work platform or scaffold;
supply the approved plans and facade drawings;
share the facade's maintenance and repair history, and any previous inspection reports;
carry out rectification promptly.
Access equipment has its own requirements. See PE endorsement for scaffolds. If no facade documents can be found, BCA says the CP should review the facade against the standards that applied when it was installed, by reference to the date of the building's TOP or CSC.
How is PFI different from Periodic Structural Inspection?
The two regimes are separate, and completing one does not exempt a building from the other.
Scope: Periodic Structural Inspection (PSI) covers structural elements such as columns, beams and slabs, and whether there is overloading. PFI covers the facade, which is generally non-structural: plaster, tiles, bricks, glass and cladding.
Frequency: PSI is once every 5 years for non-residential buildings and once every 10 years for residential buildings. PFI is every 7 years.
Who inspects: PSI must be done by a structural engineer. PFI is done by a Competent Person.
BCA says that if the two notices are served concurrently, the owner can appoint the same civil and structural Professional Engineer for both, provided that person is eligible for each. Two separate reports are still required. Our guide to BCA Periodic Structural Inspection and our PSI service page cover the structural side.
Which law governs what?
Building Control Act 1989, Part 5: inspection of buildings and building facades.
Building Control (Periodic Inspection of Buildings and Building Facades) Regulations 2021: the detailed PFI requirements.
Building Maintenance and Strata Management Act: a general duty on the persons responsible, usually owners, to keep exterior features maintained and securely fixed. BCA states the penalty as a fine of up to $10,000, imprisonment of up to 12 months, or both.
Building Control (Reportable Matters) Regulations 2025: BCA's page asks that a fallen exterior feature incident be reported by phone within 6 hours and by written report within 24 hours.
Common mistakes
Appointing late. An owner who fails to appoint a CP within 2 months of the notice commits an offence, with a fine of up to $20,000.
Assuming other work counts. BCA says most repair and redecoration works do not meet the PFI requirements, and a recent PSI does not exempt a building. A partial facade refurbishment does not either.
Appointing someone with a conflict. The designer or builder of the building cannot be its CP.
Expecting a sale to end the duty. The building must still be inspected, and the owner served with the notice remains responsible for the recommended remedial works.
Waiting for a notice to maintain the facade. BCA reports more than 20 incidents of fallen facade elements a year on average, and expects routine maintenance regardless of the PFI cycle.
FAQ
Can the inspection be deferred because of repainting or recladding?
Owners can write to BCA with details of the works and timeline. BCA reviews deferment requests case by case.
Can the same engineer do the PSI and the PFI?
Yes, where both notices are served concurrently and the engineer is eligible for both. Separate reports are submitted.
What if the Competent Person does not inspect properly?
BCA states that a CP who fails to inspect in accordance with the Act and Regulations is liable on conviction to a fine of up to $50,000.
Can drones replace the close-range inspection?
No. Drones assist the visual inspection. The 10% close-range inspection on each elevation is still required.
Sources
CVC Engineers advocates education and public awareness, and has a dedicated team to help resolve this properly. To discuss an inspection notice or building inspections, WhatsApp +65 9342 7551. Last reviewed: November 2026.