Deep Excavation in Singapore: Geotechnical Building Works and AC Geo Requirements
A deep excavation in Singapore becomes geotechnical building works (GBW) once it is more than 6 m deep. At that point BCA requires four appointments for the plan submission: a QP(ST) and an accredited checker (AC) for the structural aspects, and a QP(Geo) and a specialist accredited checker, AC(Geo), for the geotechnical aspects. The submission must include a site investigation report certified by a professional engineer, and during construction the project must implement the approved monitoring and file a monthly return to BCA through CORENET.
What counts as geotechnical building works?
Geotechnical building works are tunnels more than 2 m across, excavations, earth retaining structures and slopes more than 6 m deep or high, and foundations for buildings of 30 or more storeys. BCA's GBW submission requirements dated June 2026 define them as:
Any excavation or other building works to make a tunnel with a diameter, width or height of more than 2 m.
Any excavation or other building works to make a caisson, cofferdam, trench, ditch, shaft or well with a depth of more than 6 m.
Any building works for constructing, altering or repairing earth retaining structures in or for a trench, ditch, shaft or well with a depth or height of more than 6 m.
Any earthwork or other building works for constructing or stabilising a slope with a height of more than 6 m.
Foundations for buildings of 30 or more storeys.
Who must be appointed for a deep excavation?
A GBW excavation needs a QP(ST), an AC, a QP(Geo) and an AC(Geo). The QP(Geo) is a professional engineer registered as a specialist professional engineer in geotechnical engineering, and the AC(Geo) is an accredited checker registered to check the geotechnical aspects of GBW. See what a PE(Geo) does.
BCA's guidance sets independence rules for these appointments, quoting the 2005 Committee of Inquiry report that independence of the QP is essential to avoid conflict of interest:
The supervising QP and the supervision team shall not be a partner, an officer or an employee of the developer or builder.
The AC and AC(Geo) shall not have any financial or professional interest in the project.
The AC, the AC(Geo) and the instrumentation contractor for GBW shall be appointed by the developer.
BCA's October 2026 circular on ERSS shafts also reiterates the importance of a single design QP and a single supervising QP for all building works in a project, including the ERSS. Supervision roles are explained in site supervision for structural works.
How is excavation depth measured for the 6 m threshold?
Depth is measured from where the excavation started to the final formation level. BCA's guidance adds:
On sloping ground, the heights are added together (H = h1 + h2).
Localised pits within a basement excavation are submitted as part of the main GBW plan.
An excavation for a shaft or trench with a plan area not exceeding 10 square metres, such as a diaphragm wall trench or bored pile excavation, is exempt from the GBW requirements but still subject to ERSS submission requirements.
What does the BCA submission for a deep excavation include?
The submission includes the ERSS plans, BCA's ERSS_Annex A and a site investigation report with PE certification. BCA's requirements then run in sequence:
Plan approval is required for GBW, for both the temporary and the permanent stages.
A permit is required to commence work, and BCA must be notified of commencement.
ERSS_Annex C is implemented at site during construction.
ERSS_Annex E is submitted by e-form through CORENET by the 7th of each month.
Record plans are submitted on completion, endorsed by the QPs and ACs of the approved plans.
Since 1 June 2021, a site supervision plan for structural and geotechnical building works must be submitted with the permit application for building works valued above S$7.5 million. For smaller works a copy must be kept on site. The investigation behind it is covered in soil investigation in Singapore.
What instrumentation and monitoring does BCA expect?
BCA expects an instrumentation and monitoring scheme designed by the QP, installed by an instrumentation contractor appointed by the developer, and reported monthly. Its 1 December 2025 circular on sheet pile walls describes instrumentation and monitoring as crucial to the safety of the excavation and of adjacent ground, buildings and structures, and gives these specifics for sheet pile ERSS:
A cluster of inclinometer and piezometer or water standpipe at intervals of 30 to 40 m along the wall.
Inclinometers at every potential weak point, such as a utility gap, and at higher risk locations such as near an existing building.
The QP and builder are to stop excavation and take remedial measures if the critical instruments exceed the design limit.
Where the observational method is adopted, BCA's 2019 framework requires instrument arrays at a maximum of 30 m intervals, each with an inclinometer and strut strain gauge or load cell, read daily after the decision stage. BCA's Advisory Note 1/09 on ERSS, which its June 2026 guidance cites, sets movement control limits. More detail is in instrumentation and monitoring for excavation works.
Is an impact assessment required for neighbouring structures?
BCA treats the effect of an excavation on adjacent ground, buildings and structures as part of the design. In June 2021 it issued a Framework on Performance Based Impact Assessment associated with ERSS and tunnelling works, listed in its circulars index. See impact assessment and pre-construction surveys and building near MRT lines.
What did the Nicoll Highway collapse change?
The Nicoll Highway collapse on 20 April 2004 is the reference point for Singapore's deep excavation rules. According to the government's SG101 account, a temporary retaining wall at the Circle Line MRT worksite gave way at about 3.30pm, bringing down the steel supports and a portion of Nicoll Highway and leaving a 30 m deep ravine. Four men died. The Acting Minister for Manpower appointed a Committee of Inquiry under the Factories Act, chaired by Senior District Judge Richard Magnus.
An MIT account by one of the international experts engaged to investigate summarises the technical causes: the design overestimated the strength of the soil, so the wall system was under-designed for the earth pressures; connections in the strutting system were detailed incorrectly; and when one level of bracing was overloaded, the load could not be redistributed.
Several current BCA rules cite the inquiry directly. The independence rules above quote the 2005 report. BCA also states, in line with the report and Advisory Note 1/09, that ground improvement shall be limited to soil improvement work only and shall not be used as part of the retaining wall, especially as a cantilever wall.
Which authority and regulation governs deep excavation?
BCA governs deep excavation under the Building Control Act 1989 and the Building Control Regulations 2003, and registers accredited checkers. PEB registers the specialist professional engineers who act as QP(Geo). The Singapore Accreditation Council accredits site investigation bodies. Carrying out building works without approved plans or a permit is an offence under the Building Control Act, with a fine of up to $200,000, imprisonment of up to 2 years, or both.
What goes wrong in deep excavations?
Recent BCA circulars were issued in response to actual incidents, and they show where excavations fail today:
Gaps in sheet pile walls. BCA's December 2025 circular followed ground loss incidents involving declutched sheet piles, particularly in reclaimed sand. It applies as requirements to GBW projects from 1 June 2026.
Shaft excavations. BCA's October 2026 circular followed cases of ground loss and water ingress during shaft excavation in reclaimed sand and soft clays.
Utility gaps in the wall. BCA issued requirements on this in December 2024.
Too few boreholes along the wall. BCA restates the GeoSS recommendation of one borehole every 10 to 30 m for ERSS deeper than 6 m.
Monitoring that is read but not acted on. BCA requires excavation to stop when critical instruments exceed the design limit.
FAQ
At what depth is an excavation a deep excavation in Singapore?
BCA's GBW threshold is a depth of more than 6 m. An accredited checker is already required above 4 m.
Who appoints the AC(Geo)?
The developer. The AC(Geo) must have no financial or professional interest in the project.
How often is monitoring reported to BCA?
BCA's ERSS_Annex E is submitted through CORENET by the 7th of each month.
Is a 5 m deep basement geotechnical building works?
No. It needs a QP(ST) and an AC, but not a QP(Geo) or AC(Geo).
Sources
CVC Engineers advocates education and public awareness, and has a dedicated team to help resolve this properly, including PE geotechnical and tunnel endorsement and ERSS submissions. WhatsApp or call +65 9342 7551. Last reviewed: November 2026.


Comments