top of page

Search
Demolition in 2027 Under the New Code: What Changes on Site
The new code is SS 557:2026, the revised Singapore Standard Code of Practice for Demolition, which BCA adopted on 2 June 2026 and which supersedes SS 557:2010. BCA expects compliance for demolition plan submissions on projects whose planning permission application is made to URA on or after 1 Dec...

Stephen Huong
6 days ago4 min read
Why Buildings Are Demolished in Singapore: En Bloc Leases and Land Scarcity
Why buildings are demolished in Singapore: land scarcity and the Master Plan, en bloc sale thresholds, lease expiry, SERS and VERS, industrial renewal, and the conservation and embodied carbon counterweights.

Stephen Huong
6 days ago8 min read
The Future of Demolition in Singapore: Deconstruction Robotics and Circularity
The future of demolition in Singapore: SS 557:2026, soft stripping and deconstruction, crushed concrete aggregate, embodied carbon under Green Mark, remote-controlled machines, real-time monitoring and ageing stock.

Stephen Huong
6 days ago9 min read
12 Things Building Owners Do Not Know About Demolition in Singapore
Twelve verified facts about demolition in Singapore that owners miss: BCA approval, hacking exemptions, no Accredited Checker, PE method statements, 10 m, 35 m and 50 m neighbour surveys, asbestos, noise and penalties.

Stephen Huong
6 days ago8 min read
Demolition Statistics in Singapore: Waste Recycling Accidents and Activity
Demolition statistics in Singapore with year and source: construction and demolition waste and its 99% recycling rate, demolition accidents, construction injuries and demand, and the redevelopment pipeline.

Stephen Huong
6 days ago8 min read
PE Endorsement for Demolition and Hacking Works in Singapore: Who Can Sign
PE endorsement for demolition and hacking works in Singapore can only be signed by a civil or structural Professional Engineer with a valid PEB practising certificate. What it certifies, HDB and MCST rules, and how to verify.

Stephen Huong
6 days ago8 min read
Demolition Process in Singapore Step by Step: From Survey to Site Clearance
The demolition process in Singapore in twelve steps: QP and builder appointment, pre-demolition and asbestos surveys, URA clearance, BCA plan approval and permit, soft stripping, utilities, neighbours, supervision and site clearance.

Stephen Huong
6 days ago8 min read
Types of Demolition Submission in Singapore and Which One Applies to You
The types of demolition submission in Singapore: total and partial demolition, strata units, non-structural hacking, unauthorised structures, CORENET X, conserved buildings, HDB and JTC, with who submits and what approval applies.

Stephen Huong
6 days ago8 min read
Demolition in Singapore: The Complete Guide to Rules Process and Engineering
Demolition in Singapore explained: BCA plan approval and permit, pre-demolition survey, asbestos, structural appraisal, demolition plan, protection of neighbours, debris recycling, who regulates what, and SS 557:2026.

Stephen Huong
6 days ago11 min read
Asbestos and Hazardous Materials Before Demolition in Singapore: What the Law Requires
Asbestos before demolition in Singapore: buildings built before 1 January 1991 need an asbestos survey, removal by an MOM-approved contractor with 1 week's notice, and disposal under NEA rules.

Stephen Huong
Nov 116 min read
Demolition Method Statement and Demolition Plan: What a Professional Engineer Endorses
What a demolition method statement and demolition plan must contain in Singapore, and what the Professional Engineer checks: structural appraisal, sequence, propping, floor loading and public protection.

Stephen Huong
Nov 116 min read
Hacking vs Demolition in Singapore: Which Works Need BCA Approval and a PE
Hacking vs demolition in Singapore: hacking a non-load bearing wall needs no BCA approval, but any work on structural elements needs approved plans, a permit and a Qualified Person. A guide by property type.

Stephen Huong
Nov 116 min read
Demolition Submission in Singapore: BCA Approval Demolition Plan and PE Requirements
A demolition submission in Singapore needs BCA structural plan approval and a permit, prepared by a Qualified Person. Who submits, what the demolition plan contains, SS 557:2026 and the other agencies involved.

Stephen Huong
Nov 116 min read
bottom of page