Why Buildings Are Demolished in Singapore: En Bloc Leases and Land Scarcity
Buildings in Singapore are usually demolished because the land is worth more redeveloped than the building is worth kept, not because the structure has failed. The main drivers are land scarcity and planned intensification, collective (en bloc) sales of ageing private developments, leases that run down and return land to the State, public housing renewal, and industrial estate rejuvenation. Conservation and, more recently, embodied carbon are the two counterweights. This article sets out each driver with the official figures behind it, and is part of our complete guide to demolition in Singapore.
Why does Singapore demolish buildings that are still structurally sound?
Most demolition in Singapore is planned redevelopment: sound buildings are cleared so the same land can carry more floor area or a different use. The Master Plan 2025, gazetted by URA on 1 December 2025, is the statutory land use plan that guides development over the next 10 to 15 years, and it is the document that decides what a site may become.
The Minister for Law made the engineering point plainly in Parliament on 8 September 2026: buildings do not have expiry dates, and a well-maintained reinforced concrete building can continue to stand and function. What changes with age is the cost of keeping it in good condition. Cracking and spalling become more frequent, lifts need modernising and structural repairs grow more extensive. When that rising cost meets a higher permitted intensity on the Master Plan, demolition and rebuilding becomes the rational choice.
The scale is visible in the waste data. NEA recorded 1.15 million tonnes of construction and demolition (C&D) waste in 2025, up from 708,000 tonnes in 2024, and its 2022 statistics note that the rise that year came from more demolition projects. Our demolition statistics article gives the full series.
What is a collective (en bloc) sale and what consent is needed?
A collective sale is the sale of a whole strata development to a single buyer by majority consent under the Land Titles (Strata) Act, and it is the main route by which private residential blocks are demolished. Since 1999 the consent threshold has been 90% for developments less than 10 years old and 80% for developments aged 10 years or more.
The Land Titles (Strata) (Amendment) Bill 2026, introduced on 4 August 2026, had its Second Reading on 8 September 2026, and the Ministry of Law says the commencement date will be announced. The Bill adds two lower tiers for older developments. The Bill's table applies each threshold to both the share values and the total area of the lots:
Less than 10 years old: 90% (unchanged)
10 to 39 years old: 80% (unchanged)
40 to 59 years old: 70% (new)
60 years and older: 65% (new)
Under the Bill, the age of a development is counted from the latest Temporary Occupation Permit issued for its buildings, or the latest Certificate of Statutory Completion if no TOP was issued. The Ministry of Law has said the commencement date will be announced when ready, so owners should check whether the new tiers are in force before relying on them.
The same Bill tightens the process. The requisition needed to form a collective sale committee rises to 35% of owners by share value or number of units (from 20% or 25%), the time to collect signatures falls from 12 months to 6 months, and the restriction period after a failed attempt extends from 2 years to 3 years.
How many private developments are old enough to be redeveloped?
About one in 20 non-landed private residential units is now aged 40 years or older, which is around 20,000 dwelling units in close to 250 developments, according to the Minister for Law's Second Reading speech of 8 September 2026. He added that this number will grow because of the building boom of the 1970s, 1980s and 1990s.
The speech also explains why older developments lean towards sale. As examples of lifecycle cost, it cites lift modernisation from about $120,000 per lift and full lift replacement at $200,000 to $300,000 per lift, alongside repainting, facade inspections, spalling concrete repairs and waterproofing. Those are costs the owners carry whether or not they sell. A periodic structural inspection often brings the repair bill into focus, and our article on common structural defects by building age explains what engineers typically find.
What happens when a 99-year or shorter lease expires?
As a general policy, leasehold land returns to the State when the lease expires, which allows the land to be rejuvenated for new social and economic needs. That is the position stated by the Minister for Law in a written parliamentary answer on the first private residential leases to run out.
The reference case is Lorong 3 Geylang. There were 191 private terrace houses on 60-year leases that expired on 31 December 2020. The Singapore Land Authority announced on 20 June 2017 that the land would return to the State on expiry, and it is slated for public housing. Buildings on land that has reverted are then cleared for the next use.
Lease decay therefore drives demolition in two ways: directly, when the State takes the land back, and indirectly, because owners of ageing leasehold strata developments have a reason to sell collectively while there is still value to share.
How do SERS and VERS lead to demolition of HDB blocks?
The Selective En bloc Redevelopment Scheme (SERS) is the compulsory acquisition and redevelopment of selected old HDB precincts, and it has been the main reason HDB blocks are demolished. HDB introduced SERS in August 1995 and states that it is highly selective and that there are currently no plans for more SERS projects, because most sites with high redevelopment potential have already been selected.
At the National Day Rally 2018 the Prime Minister said HDB estimated that only around 5% of flats are suitable for SERS. The same speech announced the Voluntary Early Redevelopment Scheme (VERS):
VERS is meant to redevelop precincts in ageing estates progressively, from about the 70th year of the lease onwards.
Residents of the precinct vote. If they vote yes, the Government buys back the whole precinct and redevelops it.
The terms will be less generous than SERS because there is less financial upside.
When announced in 2018, VERS was described as a long-term plan that would not start for about 20 years.
The details of VERS are still being worked out by the Government, so treat any description of its terms as provisional and check MND and HDB for current information. What matters for the demolition pipeline is the direction: orderly, phased clearance of older HDB towns rather than a single wave when leases end.
Why are industrial estates being redeveloped?
Older industrial estates are being rejuvenated because low-rise factories on mature industrial land use that land less intensively than current planning allows. JTC describes this as the rejuvenation of mature industrial lands and estates.
JTC is also testing the alternative to wholesale demolition. On 25 June 2024 it launched its first Industrial Government Land Sales site that requires adaptive reuse, at Kallang Way, where an existing 1980s terrace factory block is retained for continued industrial use. For anyone altering rather than clearing a factory, see our guide to additions and alterations.
What stops a building from being demolished?
Conservation is the main legal barrier: a conserved building cannot be demolished or altered without URA's conservation permission. URA states that since the conservation programme began in 1989, over 7,200 buildings and structures in more than 100 areas have been conserved (URA media release, 14 May 2025).
The penalties are real. Under the Planning Act 1998, offenders may be fined up to $500,000, jailed for up to 12 months, or both. In April 2026 URA announced the first prosecution for unauthorised works to a conserved building since the 2017 amendments: an individual and a company were fined $250,000 and $150,000 respectively after key features of a pre-war shophouse were demolished without permission, and the owner was ordered to reinstate the building at its own cost.
Demolish or retrofit: where does embodied carbon come in?
Retaining the existing structure avoids the carbon emitted in demolishing it and building a replacement, and Singapore's green building framework now rewards that. BCA's Green Mark 2021 Whole Life Carbon section (2nd edition, effective 1 January 2024) gives credit where existing structures are conserved and not demolished, or where demolition follows an enhanced protocol with at least 40% of crushed concrete waste sent to approved recyclers.
JTC put a number on one case: retaining only the first floor of the Kallang Way terrace factory block, about 2,000 sqm of gross floor area, can potentially abate approximately 5,000 tonnes of carbon emissions. BCA notes that buildings account for over 20% of Singapore's emissions. Retrofit is not always feasible, because old structures may not suit new loads, floor heights or fire safety requirements, and that judgement needs a structural assessment rather than an assumption. Our article on the future of demolition covers where this is heading.
Which authority governs each driver?
Each reason for demolition sits under a different agency, and the demolition itself is always a BCA matter.
URA: the Master Plan, planning permission and conservation permission.
Ministry of Law and the Strata Titles Boards: collective sales under the Land Titles (Strata) Act.
SLA: State land and lease expiry.
HDB and MND: SERS and VERS.
JTC: industrial estate rejuvenation.
BCA: approval of the demolition plan and the permit to carry out demolition works under the Building Control Act. See demolition submission in Singapore and types of demolition submission.
MOM and NEA: workplace safety, asbestos, noise and waste.
What goes wrong when owners plan a redevelopment?
The common mistakes come from treating the decision to redevelop as the end of the matter, when the engineering and approvals have not started.
Assuming a sale or planning approval authorises demolition. It does not. Demolition needs its own BCA plan approval and permit.
Not checking conservation status before buying or starting works.
Relying on the new 70% and 65% thresholds before their commencement date is announced.
Forgetting the pre-1991 asbestos survey and the neighbour survey. See 12 things building owners do not know about demolition.
Ruling out retrofit without a structural appraisal.
FAQ
Why are relatively young buildings demolished in Singapore?
Because the land can lawfully carry more development than the existing building provides. Redevelopment is driven by land value and the Master Plan, not by structural failure.
What percentage of owners must agree to an en bloc sale?
90% for developments under 10 years old and 80% for those aged 10 years or more. The 2026 amendment Bill adds 70% for developments aged 40 to 59 years and 65% for those aged 60 years and older, from a commencement date still to be announced.
Can a 99-year lease be extended to avoid demolition?
The stated general policy is that leasehold land returns to the State when the lease expires. Do not plan on an extension.
Will my HDB block be demolished under SERS?
HDB says there are currently no plans for more SERS projects. VERS, announced in 2018 for flats from about their 70th year, is voluntary and its terms are still being developed.
Can a conserved shophouse be demolished and rebuilt?
Not without URA's conservation permission. Unauthorised demolition carries a fine of up to $500,000, up to 12 months' imprisonment, or both, and the owner can be required to reinstate the building.
Is it greener to retrofit than to demolish?
Often, because the existing structure's embodied carbon is kept. Green Mark 2021 gives credit for conserving existing structures, but feasibility depends on a structural assessment.
Sources
Ministry of Law: Proposed amendments to the collective sale regime (4 August 2026)
Land Titles (Strata) (Amendment) Bill No. 18/2026 (Government Gazette)
Ministry of Law: written answer on leases at Lorong 3 Geylang
JTC: first IGLS site with adaptive reuse at Kallang Way (25 June 2024)
URA: conservation proposals under Draft Master Plan 2025 (14 May 2025)
URA media release on fines for unauthorised works to a conserved shophouse (22 April 2026)