The Periodic Structural Inspection (PSI) checks whether a building's structure is still sound; the Periodic Facade Inspection (PFI) checks whether anything on the outside of the building could fall off. Both sit in Part 5 of the Building Control Act 1989 and both start with a BCA notice to the owner, but they differ in which buildings are covered, how often, who may inspect and how the inspection is done. One does not replace the other: BCA's FAQ states that a building which has just completed its PSI cannot be exempted from PFI.

What is the difference between PSI and PFI?

PSI covers structural elements and loading; PFI covers the facade, which is mostly non-structural. In BCA's words, PSI covers structural elements such as columns, beams and slabs and an assessment of overloading, while facades are generally made up of non-structural elements such as plaster, tiles, bricks and glass. Side by side:

  • Purpose. PSI: to detect structural defects early so the building remains sound for continued occupation. PFI: to detect deteriorating facade materials and connections before they fall from height.

  • In force since. PSI: 1989, with the Building Control Act. PFI: 1 January 2022.

  • Buildings covered. PSI: all buildings except landed houses used solely as residences and temporary buildings. PFI: the same exclusions, and in addition only buildings more than 13 m high and more than 20 years old.

  • Frequency. PSI: every 10 years where at least 90% of the floor area is solely residential, every 5 years otherwise. PFI: every 7 years.

  • Who inspects. PSI: a structural engineer, meaning a PE in civil or structural engineering with a valid practising certificate. PFI: a Competent Person, either such a PE or a registered architect, who has passed the Certificate in Facade Inspection.

  • Method. PSI: Stage 1 visual inspection, then Stage 2 full structural investigation if needed. PFI: 100% visual inspection plus close-range inspection of at least 10% of each elevation, then full facade investigation if needed.

  • Report. PSI: visual inspection report with BCA's checklist and certification forms. PFI: facade inspection report submitted through CORENET.

  • Follow-up. Both: BCA vets the report, the owner carries out the recommended remedial works and submits certification of completion.

Which buildings need each inspection?

PSI applies to almost every building; PFI applies only once a building is both taller than 13 m and older than 20 years. Three details decide the borderline cases:

  • Height for PFI is measured from the ground to the highest point of the building, not counting rooftop installations such as antennae. Where one address has buildings above and below 13 m, only those above 13 m are inspected.

  • Age for PFI runs from the date of the last Temporary Occupation Permit for the whole building or, where there was none, the last Certificate of Statutory Completion.

  • Landed houses used solely as residences, and temporary buildings, are outside both regimes.

PSI also extends to listed civil engineering structures. Jetties, docks and wharves have received notices since December 2024, and bridges, underpasses and floating structures since March 2025, at 5-yearly intervals. A newly completed commercial building therefore enters the PSI cycle long before its first PFI. BCA estimated in October 2021 that about 30,000 buildings would need facade inspection in the first 7-year cycle. For how completion dates are fixed, see TOP and CSC in Singapore.

How often is each inspection, and what are the timelines?

PSI runs on a 5-year or 10-year cycle and PFI on a 7-year cycle, so the two only occasionally fall in the same year. The published timelines are:

  • PFI appointment: the owner must appoint a Competent Person within 2 months after the date of the facade inspection notice.

  • PFI advance warning: BCA issues an advisory about one year before the inspection is due, so that owners can budget and, if they wish, align the inspection with a repair and redecoration cycle.

  • PFI change of inspector: BCA must be notified within 7 days when a new Competent Person is appointed.

  • PSI appointment and report: within the periods stated in the PSI notice. BCA's public pages refer to the "stipulated timeframe" without giving a single figure, so read the notice itself.

  • PSI extension: the engineer must apply at least 5 days before the deadline.

  • Subsequent PFI: at any time during the seventh or later year after the year in which the last facade inspection notice was given.

For both regimes, owners who cannot meet a date because of tenant access, weather or a change of inspector can write to BCA for an extension, which is considered case by case.

Who can inspect?

A PE in civil or structural engineering can be appointed for either inspection, but only if the PE also holds the Certificate in Facade Inspection for PFI; a registered architect can be a Competent Person for PFI but cannot carry out a PSI. The other rules on people are:

  • Independence. For both, the inspector must have no professional or financial interest in the building. A PE or architect who was responsible for the design or construction of the building or any part of the building works is treated as having such an interest.

  • Personal involvement. The PSI engineer must personally conduct the inspection and be physically present, as BCA's circular of 2 March 2026 restates. The PFI Competent Person must take an active and personal interest but may be assisted in the physical work by Facade Inspectors under direct supervision.

  • Facade Inspectors. These may be registered Resident Engineers or Resident Technical Officers accredited for facade inspection, or others with qualifications recognised by BCA. They assist; the Competent Person remains responsible.

  • Laboratories. A Competent Person may engage testing laboratories for close-range inspection only with BCA's prior approval, and must still attend personally or through a supervised Facade Inspector.

In September 2021, shortly before the regime began, BCA counted 149 Competent Persons and 140 registered Facade Inspectors. To confirm a PE's registration and practising certificate, follow how to check a Professional Engineer.

How do the inspection methods differ?

A PSI works from the structural drawings inward; a PFI works from the outside surface inward. In a PSI the engineer obtains the approved structural layout plans, then inspects the condition of structural elements, the loading and any unauthorised works, opening up ceilings and at least 30% of cladded columns and entering a minimum share of units. In a PFI the Competent Person views the entire facade from the ground, vantage points and openings, then inspects at least 10% of each elevation at close range from a gondola, mobile elevating work platform or scaffold, using simple tools such as tapping rods and scanning devices.

The facade scope is wide. BCA's PFI Guidelines include windows and glass panels, grilles, tiles, cladding, curtain walls, plaster, brackets, gutters and downpipes, shades and awnings, green walls, screens, louvres and fins, external balustrades, signboards, clothes drying racks and certain external suspended ceilings.

Technology is treated differently too. Drones and infrared thermography can support the visual part of a PFI, with accredited drone service providers and notification to BCA, but infrared does not replace the 10% close-range inspection. See drones and technology in facade inspection. For PSI, BCA's December 2024 circular describes borescopes through small openings or existing vents and lighting points as accepted ways to see concealed structure.

What happens when defects are found?

Both regimes escalate in the same way: the inspector recommends a deeper investigation, and BCA must approve it before it starts. For PSI that is the Stage 2 full structural investigation: design checks, material tests and, if necessary, load tests. For PFI it is the full facade investigation: close-range inspection at additional locations, design checks, site or laboratory tests and exposure of concealed fixings such as curtain wall brackets. In both, a different inspector may be engaged for the second stage. Where facade repairs involve structural elements or building works, plan approval and a permit are needed first, and a PE must be engaged if the Competent Person is not one.

Unsafe conditions do not wait for the report. On finding an unsafe facade defect the Competent Person must immediately notify the Commissioner of Building Control and work with the owner on measures to protect the public. The PSI engineer must likewise tell the owner as soon as possible about any element at risk of collapse. If matters are serious enough, BCA's other powers apply: see dangerous buildings: BCA orders, closure and owner duties.

What are the penalties?

BCA's PFI FAQ publishes two figures: an owner who fails to appoint a Competent Person within 2 months of the notice is liable to a fine of up to $20,000, and a Competent Person who fails to conduct the inspection as the Act and Regulations require is liable to a fine of up to $50,000. For PSI, BCA's current public pages do not state the fine; its March 2026 circular states that enforcement action will be taken against structural engineers who fail to comply. Two further exposures sit outside the inspection regimes themselves:

  • Fallen exterior features: BCA's FAQ cites a fine of up to $10,000, imprisonment of up to 12 months, or both, for a responsible person who fails to keep exterior features properly maintained or securely fixed.

  • Unauthorised structural works discovered during a PSI: a fine of up to $200,000, imprisonment of up to 2 years, or both.

Can one engineer do both when the notices fall together?

Yes, but only when BCA serves the PSI and PFI notices concurrently. BCA's FAQ says that an owner who receives both notices concurrently can appoint the same PE (civil and structural) who is eligible to carry out both inspections. Two conditions follow. The scopes differ, so two separate reports must be submitted. And BCA states that the inspection reports will only be accepted when the PSI and PFI notices are served concurrently, so a facade inspection done alongside a PSI ahead of the PFI notice does not discharge the PFI. An owner who wants to bring a facade inspection forward can write to BCA to request an early inspection, which is reviewed case by case.

The arithmetic explains why concurrence is occasional. A 7-year facade cycle and a 5-year structural cycle coincide only once every 35 years if they start together, and a 7-year and 10-year cycle once every 70 years. In practice the notices fall together mainly by the accident of a building's completion date, so most owners should budget for the two as separate exercises that can share access equipment and drawings where the dates are close.

Common mistakes

The most frequent mistake is assuming that repainting or recladding counts as a facade inspection. BCA's position is that most repair and redecoration works do not focus on inspecting facade condition or produce a Competent Person's report; deferment can be requested but is decided case by case, and refurbishing part of a facade does not remove the need for PFI. Other mistakes:

  • Appointing the building's original designer for either inspection.

  • Asking an architect who is a Competent Person to cover the PSI as well.

  • Treating a recent addition and alteration project as a reason to skip either inspection. BCA considers waivers for PFI only where the works related to the facade, and does not postpone PSI for renovation.

  • Leaving drawings to the last minute. Both inspectors need the approved plans; see how to buy approved plans from BCA.

  • Selling the building to avoid the recommended repairs. For both regimes BCA's answer is that the duty stays with the owner served.

FAQ

Is PFI part of PSI?

No. They are separate regimes with different scopes, inspectors and intervals, and each requires its own report.

My building just completed PSI. Is it exempt from PFI?

No. BCA's FAQ states that the scopes differ and PFI cannot be exempted on that ground.

Can a registered architect carry out a PSI?

No. PSI must be conducted by a PE in civil or structural engineering. An architect with the Certificate in Facade Inspection can be the Competent Person for PFI.

Does a 12 m building need PFI?

No. PFI does not apply to buildings whose highest point is 13 m or lower measured from the ground. PSI may still apply.

Do condominiums need both?

A condominium needs PSI every 10 years and, once it is over 20 years old and over 13 m high, PFI every 7 years. The management corporation makes the appointments.

Can a unit owner ask for their own unit or facade to be inspected?

Yes, through the management corporation. For PFI this is subject to the Competent Person's discretion and the management corporation's arrangement.

Where do the detailed rules for each regime sit?

Sources