top of page
CVC Engineers Pte Ltd

Periodic Facade Inspection 2027: Is Your Building Next

Nov 12
4 min read

Your building is a candidate for a Periodic Facade Inspection (PFI) in 2027 if it is more than 13 m high and more than 20 years old, and it is not a landed house used as a residence or a temporary building. BCA serves a notice, and the owner or management corporation must appoint a Competent Person within 2 months.

Written in November 2026 from published rules; check the linked official sources for updates.

This guide works as a decision checklist. For the wider picture, see the Singapore Building Compliance Handbook 2027.

Decision steps: is your building next?

  1. Is it a landed house used solely as a residence, or a temporary building? If yes, PFI does not apply. These are excluded, along with detached, semi-detached, terraced and linked houses used for residential purposes.

  2. Is the highest point more than 13 m above the ground? Height is measured from the ground to the highest point, not counting rooftop installations such as antennae. A building of 13 m or lower is outside the regime, and where one address has taller and lower buildings only those above 13 m are inspected. See PSI versus PFI.

  3. Is it more than 20 years old? Age runs from the date of the last Temporary Occupation Permit for the whole building or, if there was none, the last Certificate of Statutory Completion. By our arithmetic, a building whose last TOP or CSC is dated 2006 or earlier will be over 20 years old by the end of 2027; BCA decides when to serve a notice. See TOP and CSC.

  4. Has the regime reached you yet? The regime began on 1 January 2022 with a 7-year interval, so by our arithmetic first-cycle inspections continue to the end of 2028. A subsequent PFI can fall at any time in the seventh or later year after the year of the last notice.

  5. Watch for the advisory. BCA has said it issues advisories about a year before a building is due, so that owners can budget.

  6. When the notice arrives, appoint a Competent Person within 2 months. An owner who fails to do so is liable to a fine of up to $20,000. In a strata development the management corporation does this; owners of a non-strata building appoint one Competent Person jointly.

  7. Notify BCA within 7 days if you later change the Competent Person.

What the 2027 owner needs to prepare

  • Appointment: a Competent Person is a PE or registered architect with the Certificate in Facade Inspection and no professional or financial interest in the building. Check credentials using how to check a Professional Engineer.

  • Access: the Competent Person inspects 100% of the facade visually and at least 10% of each elevation at close range, so plan a gondola, mobile elevating work platform or scaffold. See PE endorsement for scaffolds.

  • Documents: approved plans, facade drawings, maintenance and repair history and previous inspection reports. See how to buy approved plans from BCA.

  • Technology: drones and infrared can assist the visual part but do not replace the 10% close-range inspection. See drones and technology in facade inspection.

  • Budgeting between inspections: from 1 September 2026 BCA published indicative service lives for facade materials, for example 10 years for tile adhesive and 18 years for polymer gaskets, to help owners plan maintenance (circular APPBCA-2026-14).

What happens after the inspection

  1. The Competent Person reports to BCA through CORENET with recommended remedial measures.

  2. If defects look widespread, a full facade investigation can be proposed, which needs the Commissioner of Building Control's prior approval.

  3. The owner completes the recommended works within the period BCA specifies and submits the Competent Person's certification of completion.

  4. Where repairs involve structural elements or building works, plan approval and a permit come first, and a PE must be engaged if the Competent Person is not one. See BCA submission services.

If the Competent Person finds an unsafe defect, BCA must be told immediately and measures to protect the public follow.

What has not changed

  • The 7-year interval and the 13 m and 20-year thresholds are the same as in 2025.

  • PFI and PSI remain separate regimes with separate reports. A recent PSI does not exempt a building. See Periodic Structural Inspection.

  • The standing duty to keep exterior features securely fixed carries a fine of up to $10,000, imprisonment of up to 12 months, or both, whether or not a notice has been served.

  • A fallen exterior feature must be reported to BCA by phone within 6 hours and in writing within 24 hours.

Common mistakes

  • Appointing late. The 2-month window runs from the date of the notice.

  • Assuming a repaint or partial recladding counts. BCA says most repair and redecoration works do not meet the PFI requirement; deferment requests are decided case by case.

  • Appointing the building's designer or builder, who has an interest and cannot be the Competent Person.

  • Expecting a sale to end the duty. The owner served remains responsible for remedial works.

  • Waiting for a notice before maintaining the facade. See building inspection in Singapore.

FAQ

Does a 12 m building need a facade inspection?

No. PFI does not apply to a building whose highest point is 13 m or lower. PSI may still apply.

Can the same engineer do the PSI and the PFI?

Yes, if both notices are served concurrently and the engineer is eligible for both. Two reports are still submitted.

Can I bring the inspection forward?

BCA's FAQ says owners may write in to request an early inspection, considered case by case.

Do landed houses need PFI?

No, if used solely as residences. The owner's duty to maintain exterior features still applies.

What if the Competent Person does not inspect properly?

BCA states a fine of up to $50,000 on conviction.

Sources