Ground Improvement in Singapore: Jet Grouting Deep Soil Mixing Vertical Drains and Vibro Methods
Ground improvement means changing the soil itself, by mixing in cement, squeezing out water or densifying it, so that it is stronger, stiffer or less permeable than the natural ground. In Singapore the main methods are jet grouting and deep soil mixing in soft marine clay below excavations, prefabricated vertical drains with surcharge or vacuum on reclaimed land, and vibro methods in loose sand fill. The Building and Construction Authority (BCA) allows improved ground to strengthen the soil, but its Advisory Note 1/09 and its June 2026 submission guidance both say it must not be used as part of the retaining wall or strutting system. This article is part of our complete guide to geotechnical engineering in Singapore.
What is ground improvement and when is it used in Singapore?
Ground improvement is any technique that alters the engineering properties of soil in place, instead of replacing the soil or bypassing it with piles or walls. It is used where the natural ground is too weak, too compressible or too permeable for the works planned on it or in it.
BCA's risk-based circular on shafts for utility works (APPBCA-2026-23, 19 October 2026) names the ground that causes most difficulty: soft clays, reclaimed sand, fluvial sand and the complex formations of the Kallang Group. It defines "challenging ground" as soft to firm soil with an SPT-N value below 8, and any soil with permeability of 5 x 10⁻⁷ m/s or more. These are the soils in which ground improvement is most often specified. The background to each formation is in our article on Singapore geology for engineers.
The methods fall into three families:
Cement-based mixing: jet grouting and deep soil mixing (also called deep cement mixing), which turn soft soil into a soil-cement material.
Consolidation: prefabricated vertical drains with surcharge or vacuum preloading, which remove water from clay so that it settles and gains strength before construction.
Densification and grouting: vibro-compaction, vibro stone columns, compaction grouting and permeation grouting.
How do jet grouting and deep soil mixing work?
Jet grouting cuts and mixes the soil with a high-pressure jet of grout, water or air from a rotating drill rod, forming overlapping columns of soil-cement known as jet grout piles (JGP). Deep soil mixing (DSM) or deep cement mixing (DCM) reaches a similar result mechanically, with mixing blades or augers that blend cement binder into the soil.
In Singapore deep excavations, the usual application is a slab of overlapping columns in soft marine clay below the final excavation level. The slab acts as a buried prop between the retaining walls before excavation reaches it, which limits wall deflection, and it can help to resist basal heave. Jet grouting can form columns below a certain depth without treating the soil above, and it can work around obstructions, which is why it is also used to seal gaps in walls around utilities. Wall types are compared in our article on ERSS wall types in Singapore.
BCA's circulars name the execution standards: BS EN 12716 for jet grouting and BS EN 14679 for deep mixing.
How do vertical drains with surcharge or vacuum work?
Prefabricated vertical drains (PVDs) are plastic band drains pushed into soft clay at close spacing so that pore water has only a short horizontal distance to travel to escape. Clay consolidates slowly because water drains slowly through it. Shortening the drainage path makes consolidation that would otherwise take decades happen within a construction programme.
Drains do nothing on their own. A load is needed to squeeze the water out, and this is provided either by a surcharge (a temporary fill embankment placed on the ground and removed later) or by vacuum preloading, where suction applied under a sealed membrane has a similar effect to placing fill. The clay settles and gains strength during treatment, so most of the settlement is finished before roads, services or buildings are built. The theory is explained in our article on marine clay settlement and land reclamation.
What are vibro-compaction, stone columns and grouting used for?
Vibro-compaction densifies loose, clean sand by lowering a vibrating probe into it, and is the natural choice for hydraulically placed sand fill. Vibration rearranges the grains into a denser packing, which increases bearing capacity and reduces settlement. It does not work in clay, because clay particles do not rearrange under vibration.
Vibro stone columns are compacted columns of crushed stone formed in soils with too many fines for vibro-compaction alone. They reinforce the ground and also act as drains.
Compaction grouting injects a stiff, low-mobility grout that displaces and densifies the surrounding soil.
Permeation grouting fills the pores of granular soil with a fluid grout without disturbing the soil structure, mainly to reduce permeability. BCA's utility gap circular (APPBCA-2024-23) lists inclined grouting and permeation grouting as ways to seal the wedge next to a utility that jet grouting cannot reach.
What do BCA's rules say about ground improvement in excavations?
BCA's position is that ground improvement is for strengthening soil only and shall not be used as part of the retaining wall. Three documents say so:
Advisory Note 1/09, paragraph 18: jet-grouted piles or deep soil/cement mixing "shall be restricted to ground strengthening or soil improvement works" and shall not be used as part of the ERSS structural support system or compressive strutting system.
Geotechnical Building Works submission requirements (June 2026): ground improvement shall not be used as part of the retaining wall, especially as a cantilever retaining wall. Where grout mixed piles sit within a wall, all bending moments and shear forces must be resisted by a separate structural system such as steel soldier piles, analysed with the grout mixed piles ignored, and separate structural laggings of concrete, timber or steel must be provided between the structural members.
The same guidance shows that for an excavation deeper than 6 m, the ground improvement layer must be submitted as part of the geotechnical building works ERSS system, with the wall and struts.
Advisory Note 1/09 adds three further points. Where an improved layer is used as a base shear plug or to control basal heave, continuous monitoring of deformation, basal heave and pore pressure should be in place. The allowable wall deflection limits for soft ground still apply where that ground has been treated with JGP. Ground movement must be monitored while jet grout piles or soil mixing are being installed, because the installation itself can move neighbouring ground. Submission thresholds are set out in our guide to ERSS submission thresholds and deep excavation and AC(Geo) requirements.
How is improved ground verified?
Improved ground is verified by coring through the full depth of the columns and testing the recovered core for strength in an accredited laboratory. BCA's 2026 shaft circular sets out the most detailed current requirements, for ground improvement that supports the face of a cast-in-situ caisson shaft:
A trial before the works, at least one for each soil type, of at least three overlapping piles or columns formed with the same machine and operating parameters as the actual works.
At least two full-depth cores from the trial, taken at the overlaps, with at least one sample every 2 m of depth sent for strength testing.
During the works, a rig fitted with an electronic data logger that records the operating parameters continuously in real time.
For perimeter improvement, at least one core for every 6 m of shaft perimeter and at least four cores per shaft, taken at the overlaps.
Total core recovery (TCR) of not less than 85%.
Strength results in which every individual result exceeds 85% of the design target value on the approved plans and the mean exceeds 100% of it.
If any individual strength result fails to reach 85% of the target, the supervising Qualified Person and the builder must notify the Commissioner of Building Control. The 2024 utility gap circular applies a similar regime at gaps in ERSS walls: at least 1, 2 or 3 cores per gap for low, medium and high risk, cores not less than 50 mm in diameter, and TCR not less than 85%. Readings taken during the works are covered in our article on instrumentation and monitoring.
Which authority and standard governs ground improvement?
BCA regulates ground improvement that forms part of building works, through the Building Control Act and the plans approved by the Commissioner of Building Control. Design follows SS EN 1997-1 (Eurocode 7) with its Singapore National Annex, as described in our article on Eurocode 7 in Singapore.
BCA: Advisory Note 1/09, the June 2026 ERSS and Geotechnical Building Works submission requirements, APPBCA-2024-23 on utility gaps and APPBCA-2026-23 on shafts.
Execution: BS EN 12716 (jet grouting) and BS EN 14679 (deep mixing).
LTA: near rail structures, the Code of Practice for Railway Protection 2024 lists grouting among the ground improvement measures to be adopted to prevent ground collapse during tunnelling.
Utility agencies: the utility gap circular requires project parties to work with agencies such as PUB on protecting utilities during installation of ground improvement.
What goes wrong with ground improvement?
Most problems come from treating improved ground as if it were a uniform structural material, when its quality depends on how each column was formed. The 2026 shaft circular states that poor quality or defective ground improvement may allow localised soil and water ingress, which may lead to a sinkhole.
Gaps between columns where the overlap was not achieved, often at depth or around obstructions.
Designs that rely on the improved soil as the wall. BCA does not accept this.
Skipped or inadequate coring and testing. After a sinkhole formed beside a sewer shaft worksite in Tanjong Katong Road South on 26 July 2025, where the soil had been strengthened with jet grout piles and the shaft was being built with caisson rings, the authorities' joint statement of 11 June 2026 listed, among the alleged breaches, that mandatory tests required under the approved plans were not carried out.
No monitoring during installation, so heave or lateral movement caused by grouting pressure is not noticed.
Optimistic design parameters. The utility gap circular requires worst credible values of ground improvement parameters in design calculations.
FAQ
Can jet grout piles be used as a retaining wall in Singapore?
No. BCA Advisory Note 1/09 and the June 2026 Geotechnical Building Works submission requirements both state that ground improvement shall not be used as part of the retaining wall or strutting system. A separate structural system must carry the wall forces.
Does ground improvement need BCA approval?
Where it forms part of an ERSS that needs plan approval, yes. BCA's June 2026 guidance shows the ground improvement layer being submitted as part of the ERSS system, and for excavations deeper than 6 m this falls under geotechnical building works.
What is the difference between jet grouting and deep soil mixing?
Jet grouting uses a high-pressure fluid jet to cut and mix the soil. Deep soil mixing uses mechanical blades or augers. Both produce soil-cement columns. They are executed to different standards: BS EN 12716 and BS EN 14679.
What core recovery does BCA expect?
For shafts under APPBCA-2026-23 and utility gaps under APPBCA-2024-23, total core recovery shall not be less than 85%. If it is lower, two additional cores are taken in adjacent columns, and the work is deemed to have failed if either does not conform.
Do vertical drains strengthen the soil by themselves?
No. Drains only shorten the path for water to escape. A surcharge or vacuum load is needed to drive consolidation, and the strength gain comes from the water leaving the clay.
Is vibro-compaction suitable for marine clay?
No. Vibro-compaction densifies clean granular soils such as sand fill. Soft clay is treated by consolidation with drains and preloading, or by cement mixing.
Who checks the specialist contractor's work?
Under APPBCA-2026-23 the supervising Qualified Person checks that the specialist builder meets the stated quality requirements, including an ISO 9001 quality management system. SAC-accredited specialist builders for ground improvement are deemed to satisfy them.
Sources
BCA Advisory Note 1/09 on Earth Retaining or Stabilising Structures
BCA Geotechnical Building Works submission requirements, June 2026
BCA circular APPBCA-2026-23, Risk-based Guidelines on ERSS Shafts for Utility Works, 19 October 2026