Eurocode 7 in Singapore: How SS EN 1997 Governs Geotechnical Design
Eurocode 7 is the geotechnical design code for building works in Singapore. It is adopted as SS EN 1997-1 (general rules) and SS EN 1997-2 (ground investigation and testing), each read with its Singapore National Annex. The Eurocodes have been the only prescribed structural design standards for plan submissions to BCA since 1 April 2015, and the National Annex adopts Design Approach 1, which checks every ultimate limit state under two combinations of partial factors. This article explains how the code works in local practice. It is part of our complete guide to geotechnical engineering in Singapore.
What is Eurocode 7 and which parts apply in Singapore?
Eurocode 7 applies in Singapore as two Singapore Standards with National Annexes:
SS EN 1997-1, Eurocode 7: Geotechnical design, Part 1: General rules. BCA's 2024 slope design circular cites it as SS EN 1997-1:2010(2018)+A1:2018.
NA to SS EN 1997-1, the Singapore National Annex. The Singapore Standards eShop lists the current version as NA to SS EN 1997-1:2010(2018)+A2:2024: first published in 2010, confirmed with an amendment in 2018 and amended again in 2024. It gives Singapore's decisions for the nationally determined parameters.
SS EN 1997-2:2010 (2020), Ground investigation and testing, an identical adoption of EN 1997-2:2007, with its own National Annex.
The code covers the geotechnical aspects of buildings and civil engineering works: strength, stability, serviceability and durability. It is used together with SS EN 1990 (basis of design) and the material Eurocodes for concrete and steel.
When did Eurocodes become mandatory in Singapore?
From 1 April 2015 the Singapore and British Standard Eurocodes (SS EN and BS EN) became the only prescribed structural design standards for plan submissions. BCA circular APPBCA-2015-05 (18 March 2015) sets out the timeline:
October 2006: BCA informed the industry of the planned withdrawal of British Standards and the adoption of the Structural Eurocodes.
1 April 2013: implementation began, with a two-year co-existence period in which either the older SS/BS codes or the Eurocodes were accepted.
1 April 2015: co-existence ended and the older codes were withdrawn from the Approved Document. The Eurocodes apply to projects whose first structural plans were submitted on or after that date.
Projects already approved under the older codes continued on that basis for the rest of their structural submissions.
Which design approach does Singapore use?
Singapore uses Design Approach 1 (DA1). The Guidelines on Local Practices for Pile Foundation Design and Construction (18 January 2022, listed on BCA's guidelines page) state that Design Approach 1, as recommended in the NA to SS EN 1997-1, shall be adopted. BCA's risk-based slope design framework (circular APPBCA-2024-01) likewise requires global stability analysis for both Design Approach 1 Combination 1 (DA1C1) and Combination 2 (DA1C2), using the partial factors in the Singapore National Annex.
DA1 means two separate checks, and the design must pass both:
Combination 1 (DA1-C1) puts the partial factors mainly on the actions (loads) and leaves soil strengths at their characteristic values.
Combination 2 (DA1-C2) uses smaller factors on actions and applies factors to soil strength or, for piles, to resistance.
LTA's Civil Design Criteria (Revision A2, September 2019) applies the same logic to excavation support: the earth retaining structure is to be designed structurally for the bending moments and shear forces from DA1 Combination 1 as a minimum, and for Combination 2 where necessary.
What partial factors apply?
For axially loaded piles, the local pile guidelines tabulate the National Annex factors as follows:
Actions, DA1-C1 (set A1): 1.35 on unfavourable permanent actions and 1.50 on unfavourable variable actions.
Actions, DA1-C2 (set A2): 1.00 on unfavourable permanent actions and 1.30 on unfavourable variable actions.
Soil parameters, set M1: 1.00 throughout.
Soil parameters, set M2: 1.25 on the effective angle of shearing resistance and on effective cohesion, 1.40 on undrained shear strength and on unconfined compressive strength, and 1.00 on density.
For piles, Combination 1 is A1 with M1 and resistance set R1, and Combination 2 is A2 with M1 or M2 and resistance set R4. In Combination 2, M1 is used for calculating pile resistance and M2 for unfavourable actions on the pile such as negative skin friction. The R4 resistance factors differ for driven and bored piles and depend on whether serviceability is explicitly verified, which is one reason pile load tests matter. Factors for walls, slopes and anchors sit in other tables of the National Annex, and the purchased standard is the authority for any design.
What is a characteristic value?
Eurocode 7 defines the characteristic value of a geotechnical parameter as a cautious estimate of the value affecting the occurrence of the limit state. It is not the average of the test results and not the worst result. It is a considered value for the volume of ground that actually governs the failure mechanism being checked.
The GeoSS Guide on Ground Investigation and Geotechnical Characteristic Values to Eurocode 7 (24 April 2015) gives the local interpretation:
Characteristic values are needed for tan φ', c', cu, SPT N and CPT qc.
The designer should take the characteristic value as not more than the mean less half a standard deviation (moderately conservative parameters), or the mean less 1.65 standard deviations (inferior parameters).
Where a large soil volume is involved, a cautious estimate of the mean is appropriate. Where local failure is the concern, a cautious estimate of the low value (a 5% fractile) applies.
BCA's observational method framework (APPBCA-2019-12) uses the same idea, describing characteristic parameters as those adopted for normal designs using EC7 and distinguishing them from most probable parameters. The underlying parameters are explained in soil and rock mechanics basics.
What are Geotechnical Categories 1, 2 and 3?
Geotechnical Categories rank a project, or part of one, by complexity and risk, from 1 (small, simple structures with negligible risk) to 3 (everything outside the limits of Categories 1 and 2). The category drives how much investigation and analysis is expected. The GeoSS guide gives Singapore examples:
Category 1: landed housing on shallow foundations in firm residual soil, single storey sheds, link-ways and minor roadside drains.
Category 2: conventional buildings on shallow, raft or pile foundations, retaining walls under 6 m high, excavations under 6 m deep, embankments and ground anchors.
Category 3: foundations for buildings of 30 storeys or more, rail and road tunnels, utility tunnels over 3 m in diameter, geotechnical building works close to existing buildings, excavation support in soft soil, foundations in limestone areas for buildings above 6 storeys, and high-rise buildings above 10 storeys on reclaimed land or on soft soils more than 8 m thick in total.
Categorisation is a continuing process. The guide notes that a Category 2 project may be reclassified as Category 3 if, for instance, cavities are found during investigation. The statutory thresholds for an accredited checker and a PE (Geo) are separate from these categories and are set out in our article on ERSS submission thresholds.
What are ultimate and serviceability limit states in geotechnical design?
An ultimate limit state (ULS) is failure: collapse, loss of equilibrium, or rupture of the ground or a structural member. A serviceability limit state (SLS) is unacceptable movement: settlement, tilt, wall deflection or cracking that makes a structure unfit for use although nothing has collapsed.
Eurocode 7 separates ultimate limit states into loss of equilibrium (EQU), failure of the structure (STR), failure of the ground (GEO), uplift by water pressure (UPL) and hydraulic heave or piping (HYD). Partial factors are applied at ULS, while SLS checks are generally made with characteristic values. In built-up Singapore the serviceability check, meaning movement of neighbouring buildings, utilities and rail structures, often governs excavation design. See deep excavation and geotechnical building works and impact assessment for excavation works.
How does Eurocode 7 govern site investigation?
SS EN 1997-2 makes the designer responsible for planning the ground investigation, and Regulation 31 of the Building Control Regulations 2003 makes proper and adequate investigation a legal duty of the Qualified Person. BCA's reminder of 20 September 2023 states that the relevant standards and codes of practice are Eurocode 7 and the GeoSS guide, that the designer shall comply with the GeoSS guide on the adequacy of boreholes and tests, and that all SI works must be done by a body accredited by the Singapore Accreditation Council.
Eurocode 7 produces two reports: a Ground Investigation Report (GIR) containing the factual data and derived values, and a Geotechnical Design Report (GDR) setting out the characteristic values, calculations and drawings. BCA's guideline APPBCA-2025-16 standardises SI report content for reports dated on or after 1 March 2026. Details are in soil investigation in Singapore.
How do BCA's Advisory Note 1/09 and other circulars fit with Eurocode 7?
Eurocode 7 supplies the design method, and BCA's advisory notes and circulars add Singapore-specific requirements on top. Advisory Note 1/09 on earth retaining or stabilising structures was issued on 2 April 2009, before the Eurocodes were implemented, and replaced Advisory Note 1/05 on deep excavation. Its code references are therefore to British Standards such as BS 8002, but it remains listed on BCA's Guidelines for ST Plan Applications page, and its requirements on site investigation, robustness, sensitivity analysis, wall deflection limits, ground improvement, and instrumentation and monitoring are read alongside the Eurocode 7 calculations.
Later circulars are written directly in Eurocode 7 terms. The slope design framework notes that SS EN 1997-1 does not cover soil nail design and refers designers to BS 8006-2 for it. The observational method framework builds on the code's characteristic values.
Has the second-generation Eurocode 7 been adopted in Singapore?
Not as far as published sources show. The second-generation Eurocode 7 has been published in Europe in three parts. The British Standards Institution lists BS EN 1997-1:2024 (General rules) as published on 30 September 2024 and BS EN 1997-3:2025 (Geotechnical structures) as published on 31 March 2025, and Part 2 (Ground properties) carries a 2024 date. BSI states that it will withdraw the UK adoptions of the first-generation Eurocodes on 30 March 2028, and that until then the first-generation documents remain the applicable standards for UK works unless an authority or project specification says otherwise.
In Singapore, the current Singapore Standards remain the first-generation SS EN 1997-1 and SS EN 1997-2. The National Annex to Part 1 was amended in 2024, and BCA's September 2025 SI guideline still cites SS EN 1997-2:2007 clauses. As at November 2026 we have found no BCA announcement of a date for adopting the second generation. Designs for submission should continue to use the current SS EN 1997 and its National Annex.
What goes wrong in Eurocode 7 submissions?
The common faults are procedural, and each has a clear rule behind it:
Checking only one combination. Singapore practice under DA1 requires both.
Designing to superseded British Standards. For projects whose first structural plans were submitted on or after 1 April 2015, the Eurocodes are the only prescribed design standards.
Taking the mean of test results as the characteristic value without a cautious reduction.
Applying a factor in the wrong place, for example factoring soil strength in a Combination 1 analysis.
Too little investigation for the Geotechnical Category, so that characteristic values cannot be justified.
Passing ULS and overlooking SLS movement limits on neighbouring structures.
FAQ
Is Eurocode 7 mandatory in Singapore?
Yes, for building works submitted to BCA. Since 1 April 2015 the SS EN and BS EN Eurocodes have been the only prescribed structural design standards for plan submissions.
What is SS EN 1997?
It is the Singapore Standard adoption of Eurocode 7, in two parts: SS EN 1997-1 (general rules) and SS EN 1997-2 (ground investigation and testing), each with a Singapore National Annex.
Does Singapore use Design Approach 1, 2 or 3?
Design Approach 1, with Combination 1 and Combination 2 both checked.
Is the Singapore National Annex the same as the UK National Annex?
Not identical. The Singapore Standards eShop describes the Singapore National Annex as adopted from the British Standard with modifications. Always design to the Singapore document.
Where can I buy SS EN 1997?
From the Singapore Standards eShop. The standards are not free to download.
Does Eurocode 7 apply to temporary works such as excavation support?
Yes. LTA's criteria and BCA's circulars apply SS EN 1997 to earth retaining and stabilising structures, including temporary ones.
Sources
Singapore Standards eShop: NA to SS EN 1997-1:2010(2018)+A2:2024
Guidelines on Local Practices for Pile Foundation Design and Construction (18 January 2022)
BCA framework on risk-based slope designs, circular APPBCA-2024-01
BCA reminder to design QPs on site investigation and Regulation 31 (20 September 2023)
BCA Advisory Note 1/09 on Earth Retaining or Stabilising Structures (2 April 2009)
BCA framework on the observational method, circular APPBCA-2019-12
LTA Civil Design Criteria for Road and Rail Transit Systems, Revision A2 (September 2019)
BSI: BS EN 1997-1:2024 Eurocode 7, Geotechnical design, General rules
BSI: BS EN 1997-3:2025 Eurocode 7, Geotechnical design, Geotechnical structures
For an independent check of a geotechnical design to SS EN 1997, see our foundation design review and PE geotechnical and tunnel endorsement services.
CVC Engineers advocates education and public awareness, and has a dedicated team to help resolve this properly. WhatsApp +65 9342 7551. Last reviewed: November 2026.


Comments