Design and Build in Singapore: Roles of the QP Builder and Developer

Nov 12
9 min read

In a design and build (D&B) project in Singapore the statutory roles under the Building Control Act 1989 do not merge. The owner remains the developer, a Qualified Person (QP) still prepares the plans, a QP still supervises the works, a licensed builder builds, and for major building works an Accredited Checker (AC) still certifies the structural design. What changes is who engages the QPs: section 8 lets the builder appoint them, and section 11 requires the builder to do so where the developer has not. The Act then limits that freedom with independence rules for the supervising QP, the site supervisors and the AC.

Who is the developer in a design and build project?

The developer is the owner, not the D&B contractor. The Act defines the developer as the person for whom or on whose behalf the building works are carried out, so signing a D&B contract does not pass the role to the contractor. Under section 8 the developer must:

  • Appoint an appropriate QP to prepare the plans and an appropriate QP to supervise the works, in each case if no such person is appointed by the builder.

  • Appoint a builder licensed under Part 5A of the Act, and notify the Commissioner of Building Control of that appointment within 14 days.

  • Appoint an Accredited Checker for the detailed structural plans and design calculations of major building works.

  • For geotechnical building works, appoint a specialist accredited checker and a licensed specialist builder to monitor the instrumentation.

  • Replace without delay any QP, builder or checker who can no longer act, and notify the Commissioner within 7 days.

  • Notify the Commissioner of any contravention of the Act or the building regulations that the developer knows of or ought reasonably to know of. Failing to do so carries a fine of up to $20,000, imprisonment of up to 12 months, or both.

Can the D&B contractor appoint the Qualified Persons?

Yes. Section 11(1)(d) provides that where no QP has been appointed by the developer, the builder must appoint an appropriate QP to prepare the plans and an appropriate QP to supervise the works, together with geotechnical engineers for any geotechnical building works. BCA's guide to early contractor involvement for public sector projects (updated January 2020) describes the result: under the D&B and Design Development and Build models, the duties and responsibilities of the QPs are undertaken by the consultancy team under the awarded builder.

The duties of a QP are the same whoever appoints them. Section 9 refers throughout to a QP "appointed under section 8 or 11". The design QP must take all reasonable steps and exercise due diligence to ensure the works are designed in accordance with the Act and the building regulations. The supervising QP must do the same in supervising and inspecting the works against the approved plans, and both must notify the Commissioner of contraventions. A QP engaged by the contractor therefore owes the same statutory duties as one engaged by the owner. For the submission steps, see QP submission step by step.

What are the independence rules for the supervising QP and site supervisors?

A QP must not supervise the structural elements of any major building works, or the geotechnical aspects of geotechnical building works, if the QP or the QP's nominee is a partner, an officer or an employee of the developer, the builder, or an associate of either. That is section 9(7). Section 10(4) applies the same bar to site supervisors for the structural works of major building works.

Four points help in applying the rule to D&B:

  • The Act separates appointment from employment. The builder may appoint and pay the supervising QP, but the QP may not be the builder's partner, officer or employee. In practice the D&B contractor engages an outside consulting firm.

  • "Major building works" means building works other than minor building works, and minor building works are those prescribed in the building regulations as not needing an AC's certificate. Houses not exceeding 3 storeys are on that list in the Fourth Schedule of the Building Control Regulations 2003, so the bar in section 9(7)(a) does not reach the structural elements of a typical landed house unless the works are geotechnical building works.

  • Section 9(7) is directed at supervision. It does not restrict who may prepare the plans.

  • Site supervisors are appointed by the supervising QP, not by the builder. BCA's site supervisor page states that they are appointed by the QP during the permit application. See site supervision for structural works.

A QP who contravenes section 9(7) is liable to a fine of up to $20,000, imprisonment of up to 12 months, or both. A site supervisor who contravenes section 10(4) is liable to a fine of up to $20,000, imprisonment of up to 2 years, or both.

Who appoints the Accredited Checker and how independent must the checker be?

The developer appoints the Accredited Checker, and the Act gives the builder no power to do so. Section 8(1)(e) places the appointment with the developer for the structural plans and design calculations of major building works, and requires a checker from an accredited checking organisation where the value of the works exceeds the limit prescribed in the regulations.

Section 18 then sets the independence test. An AC must not issue a certificate if the AC has any professional or financial interest in the building works. The AC is regarded as having such an interest if the AC:

  • Is or has been responsible for the design or construction of the building or the building works in any capacity, other than limited alterations that do not affect key structural elements.

  • Is, or has a nominee who is, a member, officer or employee of a company or body with a professional or financial interest in the works.

  • Is a partner of, or employed by, a person with such an interest.

Acting as the checker and receiving the checker's fee do not count as an interest. An individual who breaches the rule is liable to a fine of up to $50,000, imprisonment of up to 2 years, or both, and a corporation to a fine of up to $100,000. In a D&B project the owner should therefore make the AC appointment itself, even where the fee is recovered through the contract sum. Our article on when your project needs an Accredited Checker covers the thresholds.

For deep excavations and other geotechnical building works, the developer also appoints the specialist accredited checker and the licensed specialist builder who monitors the instrumentation. Section 11(3) bars that monitoring builder from being a partner, officer or employee of the developer or the builder.

Who signs what?

Each statutory document is signed by the person who holds the duty, whatever the contract structure.

  1. Plans: prepared by the design QP, who must supply the approved plans to the site supervisors, the builder and the supervising QP (section 9(1)).

  2. Accredited Checker's certificate: issued by the AC appointed by the developer, for major building works.

  3. Permit to carry out structural works: applied for jointly by the developer, the QP and the builder, as BCA's permit page states.

  4. Site supervisors: appointed by the supervising QP for the structural elements.

  5. Site records, reports and certificates: kept and submitted by the supervising QP (section 9(4)).

  6. Builder's certificate: within 7 days of completion the builder certifies that the works were carried out in accordance with the Act and the building regulations, and delivers the certificate to the Commissioner (section 11(1)(f)).

  7. TOP and CSC: applied for by the project QP once the agency clearances are in. See TOP and CSC in Singapore.

What are each party's liabilities under the Act?

The offences attach to the person named in the Act, and a contract cannot reassign them. The maximum penalties in the current Act are:

  • Design QP who fails to take all reasonable steps and exercise due diligence in design: fine of up to $200,000, imprisonment of up to 2 years, or both.

  • Supervising QP who fails in the supervision duty: fine of up to $100,000, imprisonment of up to 2 years, or both.

  • Builder who fails to ensure the works follow the Act, the regulations and the approved plans: fine of up to $200,000, imprisonment of up to 2 years, or both. Section 11(11) adds that the builder remains responsible even where a sub-contractor executes the whole or any part of the works.

  • Accredited Checker who fails to check in accordance with the regulations: fine of up to $100,000, imprisonment of up to 2 years, or both.

  • Builder or specialist builder who carries on after a QP has ceased to act and before a replacement is appointed: fine of up to $200,000, imprisonment of up to 2 years, or both.

Civil liability is a separate matter decided by the contract. A D&B contract can make the contractor answerable to the owner for the whole design, but the owner's direct contractual rights against the contractor's consultants are limited unless collateral warranties are obtained.

How does a D&B owner keep control without owning the design?

An owner choosing D&B protects itself mainly through the brief and through the appointments the Act reserves to it. A practical checklist:

  • Write the requirements in measurable terms: loads, spans, clear heights, durability, services capacities and the standards to be met.

  • Appoint the Accredited Checker directly and confirm the checker has no link to the contractor or its consultants.

  • Ask who the supervising QP will be and confirm that the QP is not a partner, officer or employee of the builder or its associates.

  • Check each QP's registration and practising certificate. See how to check a Professional Engineer.

  • Require copies of every submission, approval, written direction and site record, and collateral warranties from the contractor's consultants.

  • Keep the developer's own notification duties in view: the builder's appointment within 14 days, and replacements within 7 days.

  • Consider retaining an independent engineer to review the design and the works on the owner's behalf.

The commercial comparison with the traditional route is set out in Design and Build vs Traditional Contracts in Singapore, and the contract forms in standard construction contracts in Singapore.

Which law or authority governs what?

  • Building Control Act 1989, sections 8 to 11 and 18: the duties of developers, QPs, site supervisors, builders and accredited checkers.

  • Building Control Regulations 2003: the Fourth Schedule list of minor building works, the supervision bands and the value limit for individual checkers.

  • BCA: plan approval, permits, builder licensing and the registers of accredited checkers.

  • Professional Engineers Board and Board of Architects: registration of QPs.

  • The D&B contract: design responsibility, price, time and warranties between owner and contractor.

What goes wrong

  • The owner believes the contractor has become the developer and misses its own duties to appoint, replace and notify.

  • The contractor's in-house engineer is put forward to supervise the structural elements of major building works, contrary to section 9(7).

  • The Accredited Checker is selected and instructed by the contractor's design team, which puts the independence required by section 18 at risk.

  • A QP resigns mid-project and work carries on. The Act requires the builder to stop until another QP is appointed.

  • The owner never sees the approved plans or site records and has nothing to rely on when TOP and CSC or a later defect raises questions.

FAQ

Is the D&B contractor the developer under the Building Control Act?

No. The developer is the person for whom or on whose behalf the works are carried out, which is the owner. The contractor is the builder.

Can the builder appoint the QP for design and the QP for supervision?

Yes. Section 11(1)(d) requires the builder to appoint them where the developer has not, and section 8 relieves the developer of the appointment in that case.

Can the supervising QP be an employee of the D&B contractor?

Not for the structural elements of major building works or the geotechnical aspects of geotechnical building works. Section 9(7) bars a partner, officer or employee of the developer, the builder or their associates.

Does the independence rule apply to a landed house?

Houses not exceeding 3 storeys are minor building works under the Fourth Schedule, so they are not major building works for section 9(7)(a). Geotechnical building works, such as an excavation deeper than 6 m, are treated separately.

Who appoints and pays the Accredited Checker in D&B?

The developer appoints the checker under section 8(1)(e). How the fee is funded is a commercial matter, but the checker must have no professional or financial interest in the works.

Who appoints the site supervisors?

The supervising QP, under section 10. They must be accredited and, for major building works, independent of the developer and the builder.

Does a D&B contract reduce the QP's statutory duty?

No. Section 9 applies equally to a QP appointed under section 8 or section 11.