High rise buildings in Singapore are carried mainly on large-diameter bored piles, with barrettes, piled rafts and rafts used where column loads, ground conditions or basement layouts favour them. Two regulatory lines matter: from 10 storeys, the joint BCA, IES, ACES and GeoSS circular APPBCA-2016-08 fixes minimum boreholes, ultimate load tests, working load tests and integrity tests; and from 30 storeys, the foundation is geotechnical building works that needs a specialist geotechnical engineer and a specialist accredited checker. This article explains each foundation type and states what the current BCA circulars require. It is part of our geotechnical engineering guide.

Which foundation types carry tall buildings in Singapore?

Four systems carry tall buildings: bored piles, barrettes, piled rafts and rafts. Each transfers load to competent soil or rock below the soft surface deposits.

  • Bored piles: a circular shaft is drilled, usually under casing and support fluid, a reinforcement cage is lowered and concrete is placed by tremie. They are non-displacement piles, so they cause little ground heave and can be socketed into rock.

  • Barrettes: rectangular piles excavated by grab or trench cutter under support fluid, in the same way as a diaphragm wall panel. Their shape gives high capacity and bending stiffness in one direction, which suits heavily loaded core walls and columns.

  • Piled raft: a hybrid in which the raft and the piles share the load. BCA requires the Qualified Person (QP) to evaluate and establish that load sharing.

  • Raft: a continuous slab under the whole footprint, suitable only on competent ground.

Driven and jacked piles are also used under tall blocks, with additional controls described below. For a wider comparison of pile types see foundation design in Singapore.

When do high-rise foundations become geotechnical building works?

Foundations for buildings of 30 or more storeys are geotechnical building works under BCA's submission requirements of June 2026. The examples BCA gives are a raft foundation, and a caisson, barrette piled foundation or piled raft foundation, for a building of 30 storeys or more. The practical effect is that a PE(Geo) and an AC(Geo) are involved in the geotechnical aspects in addition to the QP and the Accredited Checker. The GeoSS guide on ground investigation to Eurocode 7 (2015), which BCA circulars cite, also places foundations for buildings of 30 storeys or more in Geotechnical Category 3, the highest category. See what a PE(Geo) does and when a project needs an Accredited Checker.

How much site investigation does a tall building need?

For buildings of 10 storeys or more, APPBCA-2016-08 requires at least 1 borehole per 300 sq m of site area, 2 per block and not less than 3 per site, spaced 10 m to 30 m apart. For piled buildings, each borehole should go to the greater of more than 5 m into hard stratum with SPT blow count of 100 or more, or more than 3 pile diameters beyond the intended pile toe. The circular adds that complex geology such as limestone, bouldery ground and cavities needs a more comprehensive investigation. See soil investigation in Singapore and Singapore geology for engineers.

What pile tests does BCA require for buildings of 10 storeys or more?

APPBCA-2016-08, in force for first structural plan submissions on or after 1 April 2017, sets three minimum test quantities for buildings of 10 storeys or more.

  • Ultimate load test: 1 number or 0.5% of the total number of working piles, whichever is greater.

  • Working load test: 2 numbers, or 1% of the total number of working piles, or 1 for every 50 m length of proposed building, whichever is greater.

  • Non-destructive integrity test (high-strain dynamic test or sonic logging): 2 numbers or 2% of the total number of working piles, whichever is greater.

Working load tests are taken to a minimum of 1.5 times or 2 times the characteristic load, with pile-top settlement generally not exceeding 15 mm or 25 mm respectively. The Certificate of Supervision on Pile Load Test, with the test report, is due within 28 days of completion. Eurocode 7 and its Singapore National Annex take precedence where they are more onerous. Under the National Annex the model factor on calculated pile resistance is 1.55, reduced to 1.35 if the resistance is verified by an instrumented maintained load test, so an instrumented ultimate load test can justify shorter piles.

Can rapid load tests replace static load tests?

Yes, within limits set by APPBCA-2021-17 (1 September 2021). The 2016 circular capped rapid load tests at 50% of the working load tests for buildings of 10 storeys or more. The 2021 circular allows up to 100% replacement of static working load tests, provided site-specific correlation tests against a maintained static load test establish reliability. A correlation is unacceptable if the rapid load test settlement differs from the static result by more than 20% or 3 mm, whichever is greater. Replacing an ultimate load test is considered case by case and needs pre-consultation with BCA. Testing must follow BS EN ISO 22477-10. More in pile load tests and integrity tests.

What quality requirements apply to bored piles?

Bored piles for buildings of 10 storeys or more carry three recommended quality control tests under APPBCA-2016-08, in addition to load tests.

  • Interface coring at the pile base: 5% of working piles, or 2% if base grouting is carried out, for piles designed with characteristic unit end bearing of more than 10 MPa.

  • Concrete coring below cut-off level: 5% of working piles, where characteristic cube strength exceeds 40 MPa and working stress exceeds 7.5 MPa.

  • Pile profile test of the bore before concreting: 100% of working piles larger than 1.8 m diameter that have no casing through soft or loose soil or have no redundancy.

The circular also requires that characteristic shaft resistance be not less than 1.3 times the characteristic load unless base enhancement is used and verified by testing, that bored piles are never built without reinforcement, and that reinforcement extends beyond any soft or loose layer. Working piles must be built by the same method as the ultimate test pile, with workmanship no worse. The Guidelines on Local Practices for Pile Foundation Design and Construction (18 January 2022) add a verticality deviation of not more than 1 in 75, with 1 in 100 or tighter suggested for high-rise buildings, and a position tolerance of 75 mm.

How are piles socketed into rock, and what changes in limestone?

A rock socket carries load by shaft friction along the socket wall and by end bearing on the rock at the base, so base cleanliness and rock quality below the toe govern. In western Singapore the rock may be limestone with cavities or slump zones, and APPBCA-2025-17 (1 September 2025) sets a risk-based regime for bored piles and barrettes there. It applies to projects whose planning application to URA is made on or after 1 March 2026, or whose first structural submission is on or after that date where no planning permission is needed.

  • Risk category: a building of 30 storeys or more in the Pandan Formation or Tuas Formation is Very High risk; 10 to 29 storeys is High.

  • Boreholes: at least 1 per 100 sq m for Very High, 1 per 150 sq m for High, each subject to 2 per block.

  • Probe holes: 80% of working piles for Very High and 60% for High if any borehole meets cavities or slump zones.

  • End bearing: for Very High and High risk, end bearing may be counted only if there are no cavities in the influence zone, which for a single pile is the greater of 5 m or 3 pile diameters below the toe.

  • Shaft resistance: at least 1.5 times working load for Medium to Very High risk, unless base enhancement is verified.

  • Cavities at pile positions are grouted before piling, and for Very High and High risk the developer must provide for advance investigation before the piling contract is awarded.

How is negative skin friction handled?

Negative skin friction, or drag force, is added to the pile load wherever soft clay around the pile will keep settling, and it is checked using the over-consolidation ratio (OCR). The 2022 local practice guidelines state that drag force shall be considered when OCR is less than 1.0, and that it is particularly relevant in clay with undrained shear strength below 40 kPa or in ground subject to filling or groundwater lowering. For design, the neutral plane may be taken at 0.6 times the thickness of the consolidating layer for friction piles and at the base of that layer for end bearing piles. This matters most on reclaimed land and thick marine clay: see marine clay settlement.

What is performance-based pile design?

Performance-based pile design, introduced by APPBCA-2022-18 (1 September 2022), lets the design QP submit more than one set of bored pile design parameters in a single submission and adopt the set verified by an instrumented ultimate load test. Design Set 1 is the most conservative. After the test, the QP selects one set with the Accredited Checker's concurrence, submits form Pile_PB_Annex B1 with the interpretation report, and obtains the Commissioner of Building Control's written approval before working piles start. Optimised lengths can then be built without waiting for an amendment plan to be approved.

Which authority and which circulars govern high-rise piling?

BCA governs under the Building Control Regulations 2003, Fifth Schedule, through these documents.

  • APPBCA-2016-08: investigation, load tests and quality control tests, 10 storeys or more.

  • APPBCA-2021-17: rapid load tests.

  • APPBCA-2022-15: driven or jacked piles. Buildings of 11 storeys or more need heave monitoring of 100% of working piles and BCA's written confirmation before pile caps are built.

  • APPBCA-2022-18: performance-based pile design.

  • APPBCA-2024-14: raft and piled raft. Buildings of 10 storeys or more are high risk, and their raft must be founded minimally on hard soil.

  • APPBCA-2025-17: bored piles and barrettes in limestone areas.

  • SS EN 1997-1 with its Singapore National Annex: see Eurocode 7 in Singapore.

What goes wrong with deep foundations?

Most problems trace to the ground model or to workmanship at the pile base. Typical cases are boreholes that stop above the final toe level, a test pile built with more care than the working piles (which APPBCA-2016-08 prohibits), soft debris left at the base of a rock socket, drag force ignored in settling ground, and limestone cavities found only during boring, which stops the piling rig while probing and grouting are arranged.

FAQ

How many pile load tests does a 40-storey building need?

At least 1 ultimate load test or 0.5% of working piles, at least 2 working load tests or 1% of working piles or 1 per 50 m of building length, and integrity tests on at least 2 piles or 2%, each whichever is greater.

Is a PE(Geo) needed for a 25-storey building's piles?

Not on storey count alone. The 30-storey threshold defines foundations as geotechnical building works, although a deep basement excavation of more than 6 m on the same project would be.

What is a barrette?

A barrette is a rectangular bored pile formed by excavating a slot under support fluid and concreting it, as for a diaphragm wall panel. BCA's limestone circular applies to barrettes as well as bored piles.

Can a raft alone support a tall building?

Only on competent ground. Under APPBCA-2024-14, soft compressible layers within the pressure bulb, normally taken as at least 3 times the raft width below founding level, make the ground unsuitable, and piles should then carry the full load.

How is building settlement checked during construction?

BCA's piling advice letter requires a Certificate of Monitoring Building Settlement at the completion of every 5 storeys until roof level.

Who reviews the piling design before work starts?

The QP designs, the Accredited Checker checks, and BCA approves the structural plans. Foundation design review can also be commissioned independently.