PE Endorsement for Condo Renovation in Singapore: MCST and BCA Requirements
A condominium renovation needs a Professional Engineer (PE) in two situations. First, when the management corporation (MCST) asks for one before approving demolition inside the unit, which BCA has advised MCSTs to do for any demolition other than floor tiles since 14 January 2014. Second, when the works touch a structural element, in which case a PE acting as Qualified Person must obtain plan approval and a permit from the Commissioner of Building Control and supervise the works. In both cases the MCST's approval comes first, because under the Building Maintenance and Strata Management Act (BMSMA) every structural element of the building is common property, not part of the unit.
This article is part of our PE endorsement guide. For HDB flats, see PE endorsement for wall hacking in HDB flats and condos.
Who approves a condo renovation?
The MCST approves renovation within a strata lot under its by-laws, and government agencies approve whatever falls under their own Acts. BCA's Strata Management Guide 14, on carrying out works in lots, describes the layers:
By-laws on works in a lot (section 32 of the BMSMA). The MCST may make by-laws requiring a subsidiary proprietor to meet requirements and obtain its approval before works begin. BCA's guide says these requirements may include seeking endorsement from a professional engineer on structural works and obtaining approval from URA, SCDF and the Commissioner of Building Control.
Works affecting appearance and structural integrity (section 37(4)). The owner must obtain the MCST's authorisation before carrying out works that affect the appearance or structural integrity of the building.
Works affecting gross floor area (section 37). These need the MCST's authorisation through a 90% resolution at a general meeting.
Exclusive use of common property (section 33). If the work is fixed to common property, such as anchoring a covering to an external wall, the MCST's approval is needed and it may pass an exclusive use by-law with conditions.
What did BCA's 14 January 2014 advisory tell MCSTs to require?
BCA advised every MCST to confirm three things before approving renovation involving demolition other than hacking of floor tiles. The advisory (reference BCA BC BMSC/CIR/2013/03) was issued after cases of unauthorised demolition of structural elements during renovation in strata-titled buildings, some of which led to Dangerous Building Orders being served on the management corporation. The three requirements are:
Structural elements. All demolition involving structural elements needs plans approved by the Commissioner of Building Control and a permit to commence, and must be supervised by a Qualified Person. The advisory cites sections 5, 6 and 8 of the Building Control Act.
Non-structural elements. For demolition of non-structural elements other than floor tiles, the renovation plans should be endorsed by a PE in the civil or structural discipline certifying that no structural works are involved. The plans should show the existing building structures and elements based on the original approved plans.
Trained workers. All demolition other than floor tiles is to be carried out by contractors with trained workers certified by the BCA Academy.
The advisory also asks the MCST to do the following:
Keep a full set of approved structural plans that owners can use to plan their renovation. A copy of approved plans can be bought from BCA; see how to buy approved plans.
Conduct spot checks during the works to see that they follow the approved renovation plan.
Stop the works whenever structural reinforcement bars are exposed, call in a PE to assess and recommend remedial measures, and notify BCA.
Apply the same controls to its own renovation works within the common property.
The advisory rests on section 37(4) of the BMSMA, under which the MCST can impose conditions so that key structural elements, such as beams, columns and shear walls, are not affected.
What should the PE's letter or endorsed plan say?
The PE's certification should state that the engineer has personally checked the approved structural plan, inspected the unit, and certifies that no structural element will be altered or demolished. That is the substance of the sample in Annex A of BCA's advisory, which is meant to be affixed to the proposed renovation plans with the PE's signature and stamp and the date. A sound endorsement package therefore contains:
The renovation plan, drawn over the original approved layout, showing existing structural elements and marking every wall or element to be removed
The Annex A certification, naming the subsidiary proprietor, the unit address and the MCST
The PE's name, signature, stamp and date
Any conditions the engineer attaches, such as stopping at the beam soffit or leaving a stiffener in place
The certification cannot be given from photographs alone or without the approved structural plan, since it records a personal check and inspection. What the stamp means is covered in PE stamp and PE chop in Singapore.
When is BCA plan approval and a permit needed?
BCA plan approval and a permit are needed whenever the works are not insignificant building works, and in a condo that mainly means anything affecting a structural element. BCA's condo owner guide states that structural elements such as slabs, beams, columns and walls cannot be altered without proper assessment by a Professional Engineer and the approval of the Commissioner of Building Control.
The exemptions most relevant to a condo unit are in the First Schedule of the Building Control Regulations 2003:
Item (o): creating an opening in a non-load bearing wall, or sealing up a wall opening
Item (p): demolition, restoration or reinstatement of any non-load bearing wall
Item (n): enclosing a balcony, yard or terrace with windows and glass panels in residential buildings (which is a building control exemption only; planning rules are a separate matter, below)
When approval is needed, BCA's structural plan submission page says only a Qualified Person who is a professional engineer in the civil or structural discipline can apply. BCA processes structural plan applications without an Accredited Checker's certificate within 7 working days of complete documents, and the permit to carry out structural works within 7 working days. Works that materially affect key structural elements, such as strengthening, need an Accredited Checker. The sequence is set out in QP submission step by step and the exemptions in insignificant building works.
Who owns the structural elements in a condo?
The structural elements belong to the common property, even where they sit inside a unit. BCA's Strata Management Guide 11 lists "any structural element of the building" within the definition of common property, whether or not it is comprised within a lot, together with the waterproof membrane attached to an external wall or roof and shared pipes, wires, cables and ducts. The guide gives foundations and load-bearing walls as examples and states that an owner cannot alter common property without the MCST's approval.
This is why an owner cannot decide alone to cut a beam, core a slab or remove a shear wall inside their own unit.
What about works that add floor area, such as roofing a PES or enclosing a balcony?
Works that increase the gross floor area of the estate need a 90% resolution of the MCST, and balcony enclosure is restricted by URA. BCA's condo owner guide gives two examples of GFA-increasing work: roofing over a private enclosed space (PES) and putting a slab over a void in a unit. Strata Management Guide 14 explains that a 90% resolution means subsidiary proprietors holding at least 90% of the aggregate share value of those present in person or by proxy at the general meeting vote in favour.
URA's guidelines for flats and condominiums state:
Balconies shall not be enclosed with walls or glass panels, as they are meant to be semi-outdoor spaces.
Blinds are treated like furnishing and need no planning permission.
Balcony screens may be allowed if they can be drawn open or fully retracted and allow natural ventilation within the balcony at all times, even when fully drawn closed.
In existing developments without balcony screens, screens may be installed if they meet those criteria, and owners should follow any design guidelines set by their MCST.
Safety grilles are not considered balcony screens and do not need URA's approval.
For an awning over a PES, Guide 14 suggests the owner have a Qualified Person or PE certify the installation and check whether any submission to BCA or URA is needed. A new slab over a void is new structure and needs structural plans; see mezzanine floor approval.
Why are post-tensioned slabs and coring a special risk?
Coring or chasing into a post-tensioned slab can cut a stressed tendon, which a visual check of the slab surface will not reveal. In a conventionally reinforced slab, cutting a bar removes that bar's contribution locally. In a post-tensioned slab the tendons are stressed, so a cut tendon can release its force along its length and affect areas far from the hole. Some residential towers use post-tensioned slabs, and nothing visible in a finished unit tells the owner which type they have.
The engineer's routine is therefore to check the approved structural drawings for the slab type, locate tendons or bars by scanning before any coring, and position openings for new plumbing, floor traps or ducts away from them. If steel is exposed, BCA's instruction applies: stop, call a PE, notify BCA.
What do MCSTs commonly ask for besides the PE's endorsement?
Most MCSTs set renovation house rules or by-laws covering working hours, deposits, insurance and the use of lifts and common areas. These are set estate by estate, not by a national rule, so the amounts and hours differ. As general practice, expect to be asked for:
A renovation application form with drawings, the contractor's details and a work schedule
A refundable renovation deposit, held against damage to common property and unremoved debris
Evidence of the contractor's insurance covering the works and third-party liability
Compliance with the estate's permitted days and hours for noisy works such as hacking and drilling
Protection of lifts and corridors, and debris removal arrangements
The PE-endorsed plan described above, and authority approvals where relevant
Ask the managing agent for the current house rules before appointing a contractor.
What goes wrong
Removing a "partition" that turns out to be a shear wall or transfer element. This is the scenario BCA's advisory was written to stop.
Asking for the PE's letter after the wall has gone. The certification is about what will be demolished, and an engineer cannot honestly certify hidden conditions after the fact without investigation. See regularisation of unauthorised works.
Treating First Schedule exemption as blanket permission. Exemption from BCA plan approval does not remove the need for MCST approval or URA planning rules.
Unauthorised building works under the Building Control Act carry a fine of up to $200,000, imprisonment of up to 2 years, or both.
FAQ
Do I need PE endorsement for condo renovation?
If the renovation involves demolition other than floor tiles, BCA has advised MCSTs to require plans endorsed by a civil or structural PE. If structural elements are affected, BCA plan approval, a permit and Qualified Person supervision are required by law.
Can I hack a wall in my condo without BCA approval?
Demolition of a non-load bearing wall is an insignificant building work under the First Schedule and needs no BCA plan approval. You still need the MCST's approval, and someone competent must establish that the wall is non-load bearing.
Can I enclose my condo balcony?
URA does not allow balconies to be enclosed with walls or glass panels. Retractable screens that keep the balcony naturally ventilated may be allowed, subject to the MCST's design guidelines.
Which PE can endorse condo renovation plans?
A PE in the civil or structural discipline with a practising certificate. See how to check a Professional Engineer.
What should I send an engineer for a quotation?
The unit address, approved plans, renovation drawings, photos and the MCST's requirements. The full list is in PE endorsement form and documents.
Sources
BCA Strata Management Guide 14: Carrying out works in lots (November 2023)
BCA Strata Management Guide 11: Management and maintenance of common property
URA: Balconies, private enclosed spaces, private roof terraces and indoor recreation spaces
Singapore Statutes Online: Building Control Regulations 2003, First Schedule
CVC Engineers advocates education and public awareness, and has a dedicated team to help resolve this properly, including PE endorsement and additions and alterations in strata buildings. WhatsApp +65 9342 7551. Last reviewed: November 2026.


Comments