Factory Change of Use in Singapore: URA SCDF and JTC Requirements
Updated: Nov 12
Changing what a factory unit is used for in Singapore can need up to three separate clearances: planning permission from URA for the new use, approval from SCDF where the new use affects fire safety requirements, and the landowner's agreement, which on JTC land means a change of use application to JTC. Approval from one does not cover the others, so confirm all three before signing a tenancy or starting renovation.
What counts as a change of use in a factory?
A change of use happens when the activity in the premises moves away from what was approved, even if nothing is built. Common examples in industrial buildings:
Production space turned into storage or warehousing. SCDF treats the use of factory space as storage as a change of use.
Part of a unit converted to a showroom, canteen, office or workers' dormitory
Industrial space used for retail, a gym or a food outlet
URA assesses change of use applications against the Master Plan zoning, its prevailing guidelines, and the compatibility of the use with neighbouring developments.
What do B1 and B2 zoning allow?
Industrial land is mainly zoned Business 1 (B1) or Business 2 (B2).
B1 is for clean and light industries. URA notes that NEA requires a 50 m nuisance buffer from a B1 zone to the surrounding area, and activities needing a larger buffer may not be located in B1.
B2 is for general and special industries. NEA requires a 100 m nuisance buffer from a B2 zone.
Childcare centres can be considered in B1 developments but are not permitted in B2, and data centres need prior planning permission in either zone.
What is the 60/40 rule?
URA's use quantum control requires at least 60% of the total industrial gross floor area to be used for industrial purposes. The remaining 40% may be used for ancillary uses such as ancillary offices, showrooms and industrial canteens.
In a multi-user development, the 60/40 split applies to the whole development and again within each strata-subdivided unit. Ancillary uses must not occupy more than 40% of the unit's floor area.
A single-user development that sub-leases space to other tenants follows the multi-user controls.
Some ancillary uses carry their own conditions under URA's allowable-use guidelines:
Showroom: confined to the 1st storey, and considered only through a change of use application after the building has obtained its Temporary Occupation Permit.
Industrial canteen: temporary permission of up to 5 years, capped at 700 sqm or 5% of total GFA, whichever is lower.
Selected commercial uses (such as a minimart, medical clinic or fitness centre): outlying areas only, 1st storey, temporary permission of up to 3 years, capped at 200 sqm or 10% of GFA, whichever is lower.
Workers' dormitory: the ancillary and secondary use quantum can go up to 49% of GFA to accommodate a dormitory, under a temporary revision that took effect on 10 February 2023. See our guides to workers' dormitory types and the Dormitory Transition Scheme.
URA's assessment criteria also state that restaurants, bars, offices and commercial schools cannot be allowed in industrial premises because they are not in line with the planning intention of the site.
Lodgment or planning permission: which applies?
URA's Plan Lodgment Scheme allows uncomplicated works and changes of use to be lodged and authorised without a planning application. Its circular on the scheme excludes secondary uses within industrial and warehouse developments, naming industrial canteens, showrooms, childcare centres and workers' dormitories. These need formal planning permission.
For a change of use application, URA's published position is:
Check whether the intended use is allowed, using URA SPACE and the assessment criteria.
Prepare a location plan, a floor plan showing the proposed layout and use, and the owner's consent. For SLA, HDB or JTC leases, the land owner's consent letter is needed.
Submit through GoBusiness. The processing fee is $500, and URA generally takes 10 working days, longer if other agencies are consulted.
After approval, apply separately for the permits and licences of other agencies.
URA advises applicants not to commit to a tenancy or to renovation works before receiving its decision.
When does SCDF need to approve the change?
Under the Fire Safety Act, a person who wishes to change the use of premises, or part of them, must seek SCDF's approval. SCDF's plan approval guidance says approval is required where the new use affects fire safety requirements.
Plans must be prepared and submitted by a Qualified Person, who is a registered architect or professional engineer, and a Registered Inspector inspects the completed fire safety works.
A change of use application is incorporated in the building plan submission to SCDF. No separate submission is needed.
A storage use usually raises the fire load, so storage in a former production area needs review even when no partitions move. See our guide to SCDF fire safety submissions.
What does JTC require?
On JTC land and in JTC buildings, a change of use is subject to JTC's evaluation as landowner. JTC's guide states that:
The new usage must be compatible with the surrounding industries
The change must not breach the 60:40 space usage rule
Supporting documents include NEA Development Control and Licensing Department clearance, LTA's land use proposal form where the new use includes warehousing or a significant rise in traffic, and SCDF approval where petroleum or flammable materials above the allowed quantities are stored
JTC notifies the outcome within 10 working days of submission
If the new use also involves physical works, JTC's plan consent is required for additions and alterations even where other authorities have approved them. Our JTC factory renovation guide explains that process.
Who governs what?
URA: land use and planning permission under the Planning Act, through the Master Plan and Development Control guidelines.
SCDF: fire safety under the Fire Safety Act and the Fire Code.
JTC or other landowner: lease conditions and landowner's consent.
NEA: pollution control and buffer distances for the industry type.
BCA: any building or structural works that come with the new use, such as a mezzanine floor or new racking and storage platforms.
Common mistakes
Signing the lease first. Both URA and JTC advise against committing to a tenancy or renovation before the outcome is known.
Treating storage as "the same use". In January 2025 a warehouse mezzanine in Toa Payoh built without SCDF or BCA approval collapsed.
Ignoring the unit-level 60/40 split in strata units.
Assuming a change of use can be lodged. Showrooms, canteens, childcare centres and dormitories in industrial buildings need planning permission.
Underestimating the fire safety penalties. SCDF states that fire safety offences can attract a fine of up to $10,000, imprisonment of up to six months, or both, and serious offences a fine of up to $200,000, imprisonment of up to 24 months, or both.
Where a change has already been made, see our article on regularising unauthorised works.
FAQ
Do I need URA approval if I only change what I manufacture?
Not always. If the new activity fits the zoning and the approved use, planning permission may not be needed, but NEA's requirements and the landlord's conditions still apply. Check the approved use with URA first.
Can I use part of my factory as an office?
An ancillary office supporting the industrial operation is allowed within the 40% ancillary quantum. An independent office use is not allowed in industrial premises.
Does JTC approval replace URA approval?
No. JTC acts as landowner and URA as planning authority. URA asks for the land owner's consent letter as part of its application.