PE Endorsement for Renovation in Singapore: Hacking Walls in HDB Condo and Landed Homes
Updated: 6 days ago
A Professional Engineer (PE) is needed in a home renovation whenever the works touch, or might touch, the structure of the building. In an HDB flat, hacking any wall needs an HDB permit and structural walls cannot be removed at all. In a condominium, BCA advises management corporations to ask for a PE's certification before approving any demolition other than floor tiles. In a landed house, structural additions and alterations need structural plans prepared by a PE and approved by BCA.
Which walls can and cannot be hacked?
Homes in Singapore have two broad kinds of wall.
Structural walls. Reinforced concrete (RC) walls, shear walls, columns and beams carry the building. They contain embedded steel bars.
Non-structural walls. Brick, block and lightweight partition walls divide rooms but do not hold the building up.
The two cannot be told apart reliably by tapping. The approved structural plans are the reference, and a PE reads them against what is on site.
Household shelters are a separate case. HDB states that the walls of the household shelter must not be hacked or drilled, and that the shelter door must remain intact and operable.
What are the HDB rules for hacking walls?
HDB's renovation guidance for flat owners sets out the following:
A permit from HDB is needed before hacking down or altering any wall in the flat.
New entrances cannot be created through reinforced concrete walls.
The renovation contractor must be listed in the HDB Directory of Renovation Contractors.
Noisy works such as demolishing walls are allowed only from Monday to Friday, 9am to 5pm, and not on weekends, public holidays or the eve of major public holidays.
After the permit is approved, works must be completed within 3 months for new flats and 1 month for existing flats.
In newly built BTO flats, bathroom wall and floor finishes cannot be removed for the first 3 years. Changes after that need a permit.
HDB's building works guidelines add that non-structural walls may be demolished only up to the underside of the RC beam or slab, working from the top down, and that work must stop and HDB be informed if steel bars are found.
When does HDB require a Professional Engineer?
HDB's building works guidelines require a PE for civil or structural works to supervise the demolition of non-structural reinforced concrete elements, such as partition walls, party walls, stiffeners, lintols and hangers, and to ensure proper repair of any affected RC structural elements. The practical step is to submit the proposal through the contractor and engage a PE if HDB asks for one. A PE's endorsement does not override HDB's decision that a wall is structural and must stay.
For HDB shops, HDB's renovation guide for shop tenants and owners requires renovation applications to be made by a Qualified Person, meaning a registered architect or a PE.
What do condo MCSTs and BCA require?
In strata-titled developments, BCA states that structural elements cannot be altered without proper assessment by a Professional Engineer and the approval of the Commissioner of Building Control. Changes to external features such as windows and walls also need the approval of the management corporation (MCST).
BCA's advisory to MCSTs on renovation control, issued on 14 January 2014 after cases of unauthorised demolition of structural elements, asks the MCST to confirm three things before approving a renovation:
Demolition of structural elements has plans approved by the Commissioner of Building Control and a permit to commence, and is supervised by a Qualified Person. These are requirements under sections 5, 6 and 8 of the Building Control Act.
For demolition of non-structural elements other than floor tiles, the renovation plans are endorsed by a PE in the civil or structural discipline certifying that no structural works are involved.
All demolition other than floor tiles is carried out by contractors with trained workers certified by the BCA Academy.
The advisory also says that if reinforcement bars are exposed during the works, the works must stop, a PE must be called in to assess and recommend remedial measures, and BCA should be notified. The MCST's power to impose such conditions comes from section 37(4) of the Building Maintenance and Strata Management Act.
Works that increase the gross floor area of the estate, such as roofing over a private enclosed space, need a 90% resolution of the management corporation.
Not every wall needs BCA approval. Under the First Schedule of the Building Control Regulations, creating an opening in a non-load-bearing wall or sealing up a wall opening, and demolishing, restoring or reinstating a non-load-bearing wall, are insignificant building works that need no BCA plan approval. The catch is that someone competent has to establish that the wall really is non-load-bearing, and HDB or MCST approval still applies.
What about additions and alterations to landed homes?
URA. Additions and alterations can be lodged by a Qualified Person under URA's plan lodgment scheme only within limits. The added gross floor area must not exceed 50% of the existing approved GFA, replacement of external walls must not exceed 50% of the existing approved external walls, and structural changes to the floor area must not exceed 50% of the existing approved floor area. Beyond that, the proposal is lodged as a new erection or reconstruction.
BCA. A permit is required for all building works except insignificant building works listed in the First Schedule of the Building Control Regulations. For structural works:
Only a Qualified Person who is a PE in the civil or structural discipline can apply for structural plan approval.
An Accredited Checker's certificate is needed where the work materially affects key structural elements, such as strengthening works.
Removing a load-bearing wall, adding a floor or attic, and cutting a slab for a new staircase are typical triggers. Our A&A submission guide, QP submission walkthrough and the article on insignificant building works go further.
Who governs what?
HDB: renovation permits for flats under the Housing and Development (Renovation Control) Rules.
MCST: approval of works within strata lots, under the Building Maintenance and Strata Management Act and the estate's by-laws.
BCA: plan approval and permits for structural works under the Building Control Act.
URA: planning permission or lodgment for landed housing works.
Professional Engineers Board: registration of the PE. See how to check a PE's registration and practising certificate.
Common mistakes
Hacking first and applying later. Unauthorised building works can attract a fine of up to $200,000, imprisonment of up to two years, or both, and the owner still has to reinstate or regularise. See regularisation of unauthorised works.
Carrying on after steel bars appear in a wall being hacked.
Treating a PE's letter as a formality. The certification requires the engineer to check the approved plans and inspect the unit in person.
Buying a resale unit with earlier unapproved hacking. A pre-purchase structural assessment can pick this up before completion.
FAQ
Can a structural wall in an HDB flat be hacked if a PE endorses it?
No. HDB does not allow structural members such as reinforced concrete walls, columns, beams and slabs to be removed or tampered with.
Does my condo renovation need BCA approval?
Only if structural elements are altered. For non-structural demolition, BCA's advisory is that the MCST should ask for a PE's certification that no structural works are involved.
Who can sign the certification?
A PE in the civil or structural discipline. For submissions to BCA the engineer acts as a Qualified Person, which requires a valid practising certificate. Our guide on PE endorsement vs QP submission explains the difference.
Sources
CVC Engineers advocates education and public awareness, and has a dedicated team to help resolve this properly, including PE endorsement and additions and alterations for homes. WhatsApp +65 9342 7551. Last reviewed: November 2026.